UKRI-2960 Building R69 Design and Build
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
03 Jan 2024
Description
This document sets out the Client (UKRI) Brief for the Building to replace HRPD Building R69 for ISIS Neutron and Muon Source based at Rutherford Appleton Laboratory at Didcot, Oxfordshire. The new building will aim to provide ample space for the new instruments, better staff facilities and allow for future adaptability should new instruments or experiments need to be accommodated. The new building is proposed to be a 2-storey building built on the existing footprint. The proposed building contains a main Instrument Hall and supporting facilities such as Control Room, Meeting Room and Laboratory. The project is currently at RIBA Stage 3. https://www.ukri.org/who-we-are/procurement-contract-transparency-data/
Scope
- Reference
- UKRI-2960
- Commercial tool
- Standalone contract
- Contract dates
- 26 Oct 2023 to 20 Feb 2026
- Main category
- works
- Contract locations
- Oxfordshire
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| — | — | price | — |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—