SGN Major Works (MW) DPS.MW.727 & Intermediate Pressure (IP) DPS.IP.727 Refurbishment Dynamic Purchasing System (DPS) - Multisite 0326
Estimated value
—
Awarded value
—
Suppliers
0
Lots
2
Published
22 Dec 2022
Description
The DPS comprise the following work packages to be published as and when they become available under the following scope. Major Works (MW) Lot 1 (Lot 1 A Southern) and/or (Lot 1B Scotland) The primary works activity is for the execution of repair and replacement of mains greater than 12" and 355mm PE. Across SGN sites as they arise. • policy abandonment and replacement, with polyethylene pipework, of underground cast iron gas mains and associated steel service pipes with the majority of the cast-iron mains to be abandoned and renewed will be in the diameter range diameter range 9" - 12" ("Tier 2 Mains") • Replacement of all size steel mains and services due to their condition (non-policy mains replacement) • Diversion of mains and services at the request of a third party up to all size greater than 8" • Construction of new reinforcement mains to increase the capacity of the network up to all size greater than 8" Intermediate Pressure (IP) Lot 2 (Lot 2A Southern) (Lot 2B Scotland) The primary works activity is for the execution of Intermediate Pressure Works Across SGN sites as they arise. • Intermediate Pressure (IP) Mains Diversions - Design and Lay • IP Connections - Design and Lay • IP Service Laying (Industrial / Commercial) - Design and Lay • Governor Replacements at all pressure tiers - Design and Build
Scope
- Reference
- ocds-h6vhtk-0367ac
- Commercial tool
- Standalone contract
- Main category
- works
- CPV classifications
- 45231100452311104523111145231113452312204523122145231222
- Contract locations
- LondonSouth East EnglandSouth West EnglandScotland
Submission & procedure
- Procedure
- Restricted procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
—
Award date
—
Contract start
—
Contract end
—
Lots · 2 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Major Works (MW) | — | cancelled |
| 2 | Intermediate pressure (IP) works. | — | cancelled |