HRB Structural Steelwork
Estimated value
£5.0m
Awarded value
—
Suppliers
0
Lots
1
Published
17 Sept 2025
Description
The Hampstead Road Bridge is a 5-span, 8 steel girder structure with a composite concrete deck, spanning over the proposed HS2 railway lines. The bridge is approximately 140m long, extending from the existing Network Rail overbridge in the north to Cartmel House in the south. The Subcontractor will be responsible for the design, installation and removal of any temporary works associated with the erection of the bridge deck, including assessments of temporary stability during erection process prior to completion. Any temporary work designs will need to be approved by the Contractor. The bridge deck install will occur over 2 visits, which will be assumed core hours only. Visit number 1 will be to install the northbound carriageway steelwork and visit 2, will be to complete the southbound carriageway.
Scope
- Reference
- C4N99784590
- Total value
- £5,000,000 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 28 May 2026 to 24 Sept 2026
- CPV classifications
- 45221112 44212120 45221100 45221110 45221000
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 22 Sept 2025, 11:00 am