The Removal of Oil Tank and Site Clearance

Suffolk SourcingcontractContracts FinderRef IBC/1468SME suitableclosed

Estimated value

Awarded value

Suppliers

0

Lots

1

0 awarded

Published

09 Jul 2019

Deadline 10 Jul 2019

Description

The site is to be cleared in preparation for installation of access roads, site wide infrastructure and certain future development plots. The original buildings on the site have previously been demolished, generally to ground floor slab level although an above ground oil tank, associated bases and bund, some storage/process tank bases, some miscellaneous concrete plinths, walls and small tanks remain above ground level. Large parts of the area are to be cleared and covered with concrete paving, rails (inset into the concrete paving) and various heaps of materials, all of which are to be removed off-site or to storage on-site as described further below.

Scope

Reference
IBC/1468
Commercial tool
Standalone contract
Contract dates
28 Jul 2019 to 03 Oct 2019
CPV classifications
45111000 45100000 45113000 45112000
Particular suitability
Small and medium-sized enterprises (SME)

Submission & procedure

Submission deadline
10 Jul 2019, 11:00 pm