Supply and Installation of LTHW Replacement Boiler and Flue System
Estimated value
£156k
Awarded value
£156k
Suppliers
1
Lots
1
Published
25 Feb 2025
Description
CPI is a UK-based technology innovation centre which uses applied knowledge in science and engineering, combined with state-of the-art facilities to enable our clients to develop, prove, prototype and scale-up the next generation of products and processes. The National Formulation Centre Coxon building has a water heater boiler which is used to generate the Low Temperature hot water feed to the building to normal operating temperature of 80C. The current boiler set up is 3 stacked separate gas fired boilers which feed circulated hot water to the building heating system and the Air handling units from a common header. Water from the building is returned to the boilers for heating and recirculation.
Scope
- Reference
- 3469
- Total value
- £155,522.58 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 13 Feb 2025 to 12 Feb 2026
- CPV classifications
- 45331110
- Particular suitability
- Small and medium-sized enterprises (SME)
Submission & procedure
- Submission deadline
- 10 Jan 2025, 12:00 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£156k
Award date
13 Feb 2025
Contract start
13 Feb 2025
Contract end