Paludiculture - A literature review on the water quality and ecological impacts on paludiculture and wetter farming
Estimated value
£20k
Awarded value
£20k
Suppliers
1
Lots
1
Published
25 Apr 2023
Description
The Lowland Agricultural Peat Agenda The reduction of emissions from lowland agricultural peat, through more sustainable hydrological management has been recognised as a key policy driver in reducing Carbon emissions and reaching Carbon Budget 6 targets. The independent Lowland Agricultural Peat Task Force, due to report in early 2023, will set out a number of Recommendations to take forward the Policy Agenda, with expected implications for the Environment Agency 's core business. The new Policy direction of wetter farming and/or paludiculture advocates methods of economically viable farming whilst raising water table levels from their current, significantly drained, positions. The wider benefits and potential risks of the new direction on the water environment and biodiversity in our lowland peat landscapes is currently poorly understood. The commission will provide a baseline understanding for these risks and opportunities through a desk-based literature review. Scope of the literature review The desk based literature review will identify the key findings of existing literature, and identify evidence gaps relating to EA responsibilities for two key questions: 1. What are the short/medium/long term positive or negative water quality issues and ecological impacts of wetter farming and paludiculture? 2. How much water is required for rewetting at different scales for wetter farming and paludiculture? Consideration will be given to literature from the following sources: • Academic and field based evidence from temperate peatland systems (including UK, Western Europe and North America) • Existing evidence from rewetting for paludiculture, wetter farming and where relevant, restoration of horticultural peat sites and for nature conservation land uses • EA and partner reports and "grey literature" held by EA Area teams and others The commission might be expected to include consideration of the following themes: • The variation in location, depth and degree of degradation of lowland agricultural peat • How the lowland peatland resource intersects with EA assets and programmes • examples of how water management for wetter farming/paludiculture have been integrated with landscape/catchment scale complimentary land-uses (wetter farming, water storage and biodiversity • the seasonal water balance for different crops/land management and how this affects seasonal water demand • whether surface flooding is an issue in rewetted areas • The framework of existing regulatory mechanisms and water control practices governing water management
Scope
- Reference
- CF-0057700D8d000003VQwdEAG
- Total value
- £19,919.69 excluding VAT
- Commercial tool
- Standalone contract
- Contract dates
- 20 Feb 2023 to 04 Apr 2023
- CPV classifications
- 73200000
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Submission & procedure
- Submission deadline
- 16 Feb 2023, 11:59 pm
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£20k
Award date
20 Feb 2023
Contract start
20 Feb 2023
Contract end
04 Apr 2023
Awarded suppliers· 1 supplier
Awarded 20 Feb 2023 · Contract period 20 Feb 2023 — 04 Apr 2023
Other contracts from DEFRA
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to Jacobs UK Ltd· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| Contract Award Notice -Days Weir Refurbishment - OBC-FBC Design | contract | £1.1m | 23 Jul 2026 |
| EAN - CDF Lot 2 - Hockwold and Wissey Sluice Construction Design Support | contract | £149k | 06 Jul 2026 |
| NW CDF Preston and South Ribble FRMS Phase 3/4 Construction Design Support | contract | £172k | 25 Jun 2026 |
| NW CDF Lot 1 Mersey Strategy Phase 2 | contract | £850k | 24 Jun 2026 |
| Cribbs Patchway Metrobus Extension Road Safety Audit 3 Response | contract | £26k | 18 Jun 2026 |
| Support for drafting Outline Business Case and Full Business Case for Witton and Aston Rail Stations | contract | £93k | 11 Jun 2026 |
| PCI_LotA_190 Botley Bypass Bridge Design Completion, Beam Installation and Deck | contract | £150k | 09 Jun 2026 |
| Principal Bridge Inspections 2026/27 East Kent & Mid/ West Kent Lot 2 (Rail and Non-Rail Bridges) | contract | £203k | 09 Jun 2026 |
| Principal Bridge Inspections 2026/27 Mid/West Kent (Non-Rail Bridges) | contract | £166k | 09 Jun 2026 |
| Drainage/Watercourses | contract | £50k | 21 May 2026 |