PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,283
Live opportunities
Posted · 24h
161
New notices
Posted · 30d
5,744
All notice types
Awarded · 7d
745
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,424 noticesclosed · sorted by publication date
Page 10 of 8572
Time to close
Value
Type
Buyer
Notice
CLOSED
08 May
—
Estimated
Closed
CF
MO
Ministry of Defence
Supply Chain Notice: WC1680030 - CY-AYN-CISP Tool: 124359-F/U PPM Remedial - Replacement of Chiller- Works WC1831796 - CY-DHK-CIDP Tool Ref: 124360- FY26/27-F/U PPM Remedial - Replacement of Chiller- Works
Industrial machinery· Published 01 May
CLOSED
30 Apr
—
Estimated
Modification
FTS
KC
Kent County Council
Highways Urban Grass, Shrubs & Hedges Maintenance
· Published 30 Apr
CLOSED
30 Apr
—
Estimated
Modification
FTS
DE
Defence Equipment and Support
714964450 - Engineering Delivery Partner (EDP) Future Contract - PD1 - Pipeline Notice (UK 1)
· Published 30 Apr
CLOSED
30 Apr
—
Estimated
Modification
FTS
SB
Stevenage Borough Council
SBC 0126 Provision of Property Management Services and Business Support Services at the Business Technology Centre (BTC) and Chells Industrial Units (CIU)
· Published 30 Apr
CLOSED
30 Mar
£235k
Estimated
Closed
CF
RB
Royal Borough of Kingston Upon Thames
Wide Area Network (WAN) Services
Radio & TV equipment· Published 30 Apr
CLOSED
07 Jun
—
Estimated
Closed
CF
SC
Shropshire Council
North West Relief Road Project
Construction work· Published 30 Apr
CLOSED
02 Apr
£85k
Estimated
Closed
CF
CC
Cumberland Council
Minor Works Framework - Solway Community School - Sports Hall Boiler
Construction work· Published 30 Apr
CLOSED
30 Apr
—
Estimated
Modification
FTS
RC
Rutland County Council
RCC-1608 Rutland Residential Children's Home management and Service Delivery
· Published 30 Apr
CLOSED
29 Apr
—
Estimated
Modification
FTS
TV
Tees Valley Combined Authority
TVCA-PROC-0297 Provision of on-street electric vehicle charging infrastructure
· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Modification
FTS
DF
Department for Education
project_9810 Social Work Induction Programme (SWIP)
· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Closed
FTS · Services
TP
The Police and Crime Commissioner for Northumbria
Repairs & Maintenance of Water Hygiene Systems
· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Closed
FTS · Services
TC
The Crown Estate
Outer Dowsing
Petroleum & fuel· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Closed
FTS · Services
TC
The Crown Estate
Dogger Bank South (East)
Petroleum & fuel· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Closed
FTS · Services
TC
The Crown Estate
Dogger Bank South (West)
Petroleum & fuel· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Modification
FTS
GL
Greater London Authority (GLA)
Homes Off the Streets Clearing House and Tenancy Sustainment Teams
· Published 29 Apr
CLOSED
29 Apr
—
Estimated
Closed
FTS · Services
NW
NHS Wales LHBs & Trusts
General Medical Services Vacant Practice
Health & social· Published 29 Apr
CLOSED
08 May
£20.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Fire and Rescue Services
Transport equipment· Published 29 Apr
CLOSED
08 May
£40.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Instrumentation and Monitoring
Electrical machinery· Published 29 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
NN
North Northamptonshire Council
North Northamptonshire Council Provision of Cremator Servicing and Maintenance at Kettering Crematorium (RFQ)
· Published 28 Apr
CLOSED
28 Apr
—
Estimated
Modification
FTS
LS
LOCAL SPACE
Insurance Services
· Published 28 Apr
Page 10 of 8572
PreviousNext