PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: All notices×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
1
New notices
Posted · 30d
12,982
All notice types
Awarded · 7d
1,547
Market signal

Notice peek

×
WP
TenderFTS · 06b13a

Path renovation

Wincham Parish Council
Status
active
Estimated
—
Works
Published
09 Jun 2026

Key facts

Notice ID
ocds-h6vhtk-06b13a
CPV code
45233161 · Construction work
Contract type
works
Source
Find a Tender

Timeline

  1. Published
    09 Jun 2026
  2. Submission deadline
    16 Jun 2026 · 2 days from now

Description

Scope of Work The Wincham Parish Council (WPC) wish to upgrade the Linnards Lane Playing Field. The plan includes the resurfacing and widening of the existing path and installing chicane fencing at the Ashgate Lane entrance. This WPC is looking for this project to be completed in the summer of 2026. The WPC has a Project Strategy with a number of key steps in order to ensure that the correct level of planning and preparation goes into the plan. Part of this is to ensure that the funding, scope of work, Quality and Health and Safety (H&S) is adequately controlled and managed. Widen and resurface existing path to modern standard The existing path is estimated to be 216 metres in length and runs along the northern part of the playing field from the Birch Grove entrance to the Ashgate Lane entrance and then turnSee Figure 1 which provides an aerial view of the playing field. The requirement is for the refurbished path to be accessible to people with limited mobility, wheelchair users and people with sensory impairments. The path width shall be such that there is room for two wheelchairs, or two people, side by side. Any gradient steeper than 1:20 is considered a ramp and therefore the path should be adjusted accordingly. The Construction Contractor shall temporarily remove any existing park benches and waste bins away from the area of work and subsequently replace them in suitable locations, to be agreed with WPC. The Construction Contractor shall remove the vegetation and topsoil to widen the path to 2.5 metre width (the topsoil is to be stockpiled on site for later use). The Contractor shall break out a trench adjacent to the existing path to create the wider path. The arisings shall be taken off site by the Contractor who shall comply with all the necessary Environmental Requirements necessary for the scope of work including Waste Acceptance Criteria (WAC) testing for generated material if exported. The path and any ramps should have a slight cross-fall to shed water. However, cambers present difficulties for both wheelchair users and people with visual impairments. Therefore, this is to be minimize. Surfaces should be well constructed and should give firm, non-slip, level access. Concrete edging is to be provided along the whole length of the path. On completion of the path works the Contractor shall make good all of the grass areas that have been damaged to an acceptable state to be agreed with the WPC or their representative. Health and Safety The Contractor shall identify all the Health and Safety requirements applicable to this project. This shall cover, but not limited to, the following: • Visiting Supervisor/Inspections • Construction plan • Risk Assessments • Method Statements • Emergency access provision? To double up as access for the works • Temporary Works for access to be maintained • Security CDM site requirements shall cover, but not limited to, the following: • Materials lay down area/protection • Herras fencing • Safety signage to fencing • Welfare self-contained • Toilet self-contained, plus emptying The Contractor shall advise the WPC of any public access restrictions required during the implementation of the works. Environmental The Contractor shall comply with all the necessary Environmental Requirements necessary for the scope of work including Waste Acceptance Criteria (WAC) testing for generated material if exported. Quality Requirements The Contractor shall identify all the necessary Quality requirements. Programme The Contractor shall provide a proposed programme of works. This WPC is looking for this project to be completed in the summer of 2026.

You might also see

  • All Wincham Parish Council notices →
  • All Construction work notices →
Open full notice ↗View in this tab
36,541 noticesall types · sorted by publication date
Page 101 of 1828
Time to close
Value
Type
Buyer
Notice
OPEN
No deadline
—
Estimated
Tender
FTS
BM
Barnsley Metropolitan Borough Council
Builders Clean and Clear and Environmental Cleaning Services
· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
UH
University Hospitals Birmingham NHS Foundation Trust
Waiver - UHB_QEH - Optima Medical Ltd - Software Licence
· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
DO
Department of Health
ID 6197703 - DOH - Mental Health Champion Advertising Campaign
· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
LB
London Borough of Harrow
Cost Consultancy and Project Management
· Published 09 Jun
OPEN
No deadline
£1.3m
Estimated
Tender
FTS · Services
UO
University of Leicester
Framework Agreement for Construction Building Surveyors Services
Architecture & engineering· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
CL
CHILTERN LEARNING TRUST
Project Management Service
· Published 09 Jun
CLOSED
02 Jun
£65k
Estimated
Below-thresh.
CF
D
DSIT
AI Adoption Summit Event
Business services· Published 09 Jun
CLOSED
09 Jun
—
Estimated
Tender
CF
SC
Suffolk County Council Passenger Transport
2026-06-09 09:00 - QOC893 Trimley St Martin to Doucecroft School, Colchester, Essex - AWARD
Transport services· Published 09 Jun
CLOSED
20 Mar
—
Estimated
Tender
CF
HC
Hampshire County Council
G5-1_HCC_106 Woodhouse Lane - Hedge End, Shared Use Facility
Construction work· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
UO
University of Hertfordshire Higher Education Corporation
Printing Services Tender - Lot 1 Litho Digital Printing and Exhibition Printing /Lot 2 Photocopying and Security Printing
· Published 09 Jun
OPEN
No deadline
£16.0m
Estimated
Pipeline
FTS · Services
HO
Home Office
Border Force Strategic Support
IT services· Published 09 Jun
17d
30 Jun
£1.6m
Estimated
Tender
FTS · Services
MO
Mayor's Office of Policing and Crime
Protect and Prepare Capability (Role Player)
Radio & TV equipment· Published 09 Jun
10d
23 Jun
—
Estimated
Tender
FTS · Services
PO
Post Office Limited
Post Office Branch - How Wood
Postal & telecomms· Published 09 Jun
CLOSED
30 Jan
—
Estimated
Tender
CF
HC
Hampshire County Council
G5-1_HCC_104 Hamble Lane Bus Gate - Site Investigations
Construction work· Published 09 Jun
23d
07 Jul
£150k
Estimated
Tender
FTS · Services
DF
Department for Energy Security & Net Zero
Audio Visual (AV) Event Support For International Conference
Architecture & engineering· Published 09 Jun
OPEN
No deadline
—
Estimated
Modification
FTS
EM
EAST MIDLANDS HOUSING GROUP LIMITED
Maintenance market (V2)
· Published 09 Jun
CLOSED
30 Mar
£3.0m
Estimated
Tender
CF
HM
H M REVENUE & CUSTOMS
Borders Research Defined Term Agreement
R&D services· Published 09 Jun
CLOSED
05 Mar
—
Estimated
Tender
CF
BS
Bath Spa University
Panopto Recording and Captioning service
Software packages· Published 09 Jun
OPEN
No deadline
—
Estimated
Tender
FTS
UR
UK Research and Innovation
UKRI-5976 -Beyond procurement
· Published 09 Jun
17d
01 Jul
£90k
Estimated
Below-thresh.
CF
LB
London Borough of Haringey
DPS1 1372 - Winter Pollard 2026
Architecture & engineering· Published 09 Jun
Page 101 of 1828
PreviousNext