PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
344
New notices
Posted · 30d
12,482
All notice types
Awarded · 7d
1,593
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 121 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Infrastructure
Construction work· Published 07 Oct
CLOSED
13 Oct
£2.5m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Permanent Way
Construction work· Published 07 Oct
CLOSED
31 Oct
£500k
Estimated
Closed
CF
ST
Storm Tempest Ltd
CCHA Fire Door Replacement Project 25-26
Construction materials· Published 06 Oct
CLOSED
10 Oct
—
Estimated
Closed
CF
WH
West Herts College
RA353891 - WHC - up to 100 laptops for LSF department
Office & computing· Published 06 Oct
Page 121 of 8261
PreviousNext