PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
361
New notices
Posted · 30d
12,499
All notice types
Awarded · 7d
1,602
Market signal

Notice peek

×
CL
ClosedCF · ae718721a68b

WP4981 - Architectural & Fitout - T2 Space Optimisation - Landside

Costain Limited (H7-Heathrow)
Status
Closed
Estimated
£500k
Published
15 Oct 2025

Key facts

Notice ID
cf-b483d0fb-4a97-4adf-a94c-ae718721a68b
CPV code
71240000 · Architecture & engineering
Source
Contracts Finder

Timeline

  1. Published
    15 Oct 2025

Description

Demolition The Subcontractor shall strip out and dispose of (unless noted otherwise) the following items, as indicated on the design drawings: • Partitions • Doors • Porcelain tiles • Ceiling baffles and supports (to be stored and reinstalled later) • Glazing • Builders work openings (including necessary modifications to wall framework) • Door penetrations • Column cladding • Screens, chairs, tablets, monitors & desks • Screed (including for cable routes in onward travel area). Regarding the above, consider the following: • The items marked within the "Excluded Scope" document are excluded from this scope and included in another package of works. • The Subcontractor shall ensure that existing fire compartments are not compromised by the works. The Subcontractor shall allow for any intrusive surveys to determine this requirement. Design This section should be read in conjunction with Section 5 (Design) of this document. The Subcontractor shall complete detailed design for the following elements: • Raised access floor • Temporary Works (Hoarding) • Ceilings • Partitions including modification to existing • Doors • Bulkheads • Glazing • Steelwork • Signage Installation The Subcontractor shall supply (unless noted otherwise) and install the following items as indicated on the design drawings and project specifications: • Screed • Hoarding (see section below) • Porcelain tiles • Floor access covers • Ceilings • Partitions including modification works and door infills • Wall finishes, skirtings and trims • Doors • Bulkheads • Glazing • Monolith Base plates (to be free issued to the subcontractor, example provided in the document pack) • Steelwork • Firestopping • Signage and wayfinding?

You might also see

  • All Costain Limited (H7-Heathrow) notices →
  • All Architecture & engineering notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 121 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Infrastructure
Construction work· Published 07 Oct
CLOSED
13 Oct
£2.5m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Permanent Way
Construction work· Published 07 Oct
CLOSED
31 Oct
£500k
Estimated
Closed
CF
ST
Storm Tempest Ltd
CCHA Fire Door Replacement Project 25-26
Construction materials· Published 06 Oct
CLOSED
10 Oct
—
Estimated
Closed
CF
WH
West Herts College
RA353891 - WHC - up to 100 laptops for LSF department
Office & computing· Published 06 Oct
Page 121 of 8261
PreviousNext