PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
361
New notices
Posted · 30d
12,499
All notice types
Awarded · 7d
1,602
Market signal

Notice peek

×
LL
ClosedCF · a85a51e3059a

RA354019 - LondonEnergy EcoPark Roof Repairs

LondonEnergy Ltd
Status
Closed
Estimated
—
Published
14 Oct 2025

Key facts

Notice ID
cf-24c2ad4c-81bc-408b-a033-a85a51e3059a
CPV code
45000000 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    14 Oct 2025

Description

London Energy require works to 4 area of the Boiler house Roof Please see below description of works. The full spec including photos is available on MultiQuote. Please email lewis.atkinson@londonenergyltd.com for full scope and photos if you are unable to access via MultiQuote. - Required works: 1. Visual and physical barriers to 2no ~8x6m sections of roof Three sunken areas of roof have been patched and waterproofed from above. We now need visual and physical barriers to these areas to stop anyone walking from above. Two ~8x6m areas to be barriered off Requirement: - Paint: Hazard striped paint (yellow and black diagonal lines) to 8x6m area of roof - Barriers: Chain barriers around perimeter, 2 rows, suitable for high winds. - Signage: "Danger, Keep out, fragile roof" signage, or similar 2. Steel re-enforcement to underside of 1 off 4x4m section of steel decking One sunken area of roof has visible deterioration on the steel decking underside. Whilst no one will be walking from above, we want additional strengthening to this area, to mitigate risk of collapse from e.g. snowfall, while also keeping the ability to visually inspect from below. Requirement: - Clean and paint: Clean up and fire proof painting of existing deteriorated area of underside steel decking (approx. 2x3m) - Brackets: Mount several brackets from either steel beam, laid between the ridges, spaced at ~200mm intervals (or alternative suggestion), taking care not to pierce the roof membrane 3. Repair unadhered membrane to upstand. A large area of unadhered roofing membrane is present at the upstand. We now need this to be repaired. Approx 8 x 2m area, to mitigate risk of water ingress and damage to roof. Requirement: - Repair: Remove old felt membrane and lay new 4. Level out flood-prone area An approx. 12x1m area is prone to flooding. We require this to be levelled out so the water flows out of the area Requirement: - Works to level out the area to avoid it flooding during heavy rainfall Schedule Works to be completed during November 2025 RAMS RAMS required prior to commencing any works, Pricing Please provide individual pricing and details of what will be provided: - To access this competition: login to https://suppliers.multiquote.com and view the opportunity RA354019. Not registered on MultiQuote - visit https://suppliers.multiquote.com then register and quote RA354019 as the reason for registration. Any queries please contact MultiQuote on 0151 482 9230.

You might also see

  • All LondonEnergy Ltd notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 121 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Infrastructure
Construction work· Published 07 Oct
CLOSED
13 Oct
£2.5m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Permanent Way
Construction work· Published 07 Oct
CLOSED
31 Oct
£500k
Estimated
Closed
CF
ST
Storm Tempest Ltd
CCHA Fire Door Replacement Project 25-26
Construction materials· Published 06 Oct
CLOSED
10 Oct
—
Estimated
Closed
CF
WH
West Herts College
RA353891 - WHC - up to 100 laptops for LSF department
Office & computing· Published 06 Oct
Page 121 of 8261
PreviousNext