PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
280
New notices
Posted · 30d
10,300
All notice types
Awarded · 7d
1,272
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 122 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
27 Oct
£50k
Estimated
Closed
CF
GH
Gloucestershire Health & Care NHS Foundation Trust
Topographical & Utilities Survey - Cirencester Hospital site development
Architecture & engineering· Published 08 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
ES
Epsom & St Helier University Hospitals NHS Trust
CA16567 - R5996B - LIFT 14 - Queen Mary's Childrens Hospital - SHGH
Construction work· Published 08 Oct
CLOSED
17 Oct
£1.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB NC2A - Transport and installation of precast tunnel segments
Transport services· Published 08 Oct
CLOSED
15 Oct
£250k
Estimated
Closed
CF
MD
Mace Dragados
Operation and Maintenance Manuals (O & M)
Software packages· Published 08 Oct
CLOSED
08 Oct
—
Estimated
Closed
FTS · Services
LH
Lothian Health Board
Portable Appliance Testing (PAT) Services
Architecture & engineering· Published 08 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
PI
PALLADIUM INTERNATIONAL LIMITED
Partnering with India DISCOMs for Grid-Integrated Clean Energy Solutions and Emerging Technologies
Petroleum & fuel· Published 07 Oct
CLOSED
18 Nov
—
Estimated
Closed
CF
AA
Avon and Wiltshire Mental Health Partnership NHS trust
CA16562 - Alterations to BSW Female Crisis House
Construction work· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
RB
Rossendale Borough Council
Refurbishment of Shop Unit - 8 Trickett's Arcade, Waterfoot
· Published 07 Oct
CLOSED
14 Nov
£50k
Estimated
Closed
CF
FI
Falklands Islands Government Office
Strategic Review of the financial ICT systems and processes throughout Falkland Islands Government
Financial services· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
WB
West Berkshire Council
1a, 1c and 1d Local Bus Services
· Published 07 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
Page 122 of 8261
PreviousNext