PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
330
New notices
Posted · 30d
10,801
All notice types
Awarded · 7d
1,349
Market signal

Notice peek

×
KC
ClosedCF · b93f9f148938

Attenuation Precast Tanks

Kilnbridge Construction Services Ltd
Status
Closed
Estimated
£1.0m
Published
04 Sept 2025

Key facts

Notice ID
cf-9c4a1667-7de9-41c2-8bab-b93f9f148938
CPV code
51810000 · Installation services
Source
Contracts Finder

Timeline

  1. Published
    04 Sept 2025

Description

Kilnbridge have secured the HS2 Old Oak Common Station Works Package for the construction of Urban Realm elements and the Head Houses and Ancillary Buildings. Part of these works require the installation of two, precast concrete attenuation tanks to the eastern part of the site. These tanks are a Subcontractor's design portion. Eastern HS2 Attenuation Tank • Area 1115m2 • Volume 1165m3 • Tank Depth 1.1m • Void Ratio 0.95 Eastern HS2 Dirty Water Tank • Area 1115m2 • Volume 350m3 • Tank Depth 1.6m • Void Ratio 0.95 Kilnbridge are seeking the services of suitably qualified and experienced Sub-subcontractor who shall be responsible for developing the Contractors Detailed Design to Design for Construction & Manufacturing. Taking from RIBA 4 to RIBA 5 stage. The Sub-subcontractor shall be responsible for providing their own design and design for construction drawings, compliant with the design intent of the Contractors Designer. The Sub-subcontractor will be responsible for ensuring the submission and acceptance of their design from the Contractor and Contractor's design consultant through the Subcontractor. Works include the design , manufacture and supply of precast base, walls and roof units to site. Scope to include for, but not limited to, technical assurance, BIM modelling, asset scheduling and labelling, drawings for approval, as built drawings, indicative construction sequence methodology, submission of design packs, material approvals, and sustainability and environmental management. Sub-subcontractor to interface their design with incoming services as detailed on the construction drawings. Construction is currently forecasted to be carried Q2 2026

You might also see

  • All Kilnbridge Construction Services Ltd notices →
  • All Installation services notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 122 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
07 Oct
—
Estimated
Modification
FTS
RB
Rossendale Borough Council
Refurbishment of Shop Unit - 8 Trickett's Arcade, Waterfoot
· Published 07 Oct
CLOSED
14 Nov
£50k
Estimated
Closed
CF
FI
Falklands Islands Government Office
Strategic Review of the financial ICT systems and processes throughout Falkland Islands Government
Financial services· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
WB
West Berkshire Council
1a, 1c and 1d Local Bus Services
· Published 07 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Infrastructure
Construction work· Published 07 Oct
Page 122 of 8261
PreviousNext