PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
124
New notices
Posted · 30d
7,089
All notice types
Awarded · 7d
883
Market signal

Notice peek

×
JM
ClosedCF · 8598f9747225

Greek Street - Deck Construction Works

J Murphy & Sons Limited
Status
Closed
Estimated
£1.0m
Published
07 Mar 2025

Key facts

Notice ID
cf-f9866d25-f8cb-4163-a678-8598f9747225
CPV code
45221112 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Mar 2025

Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 124 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
07 Oct
—
Estimated
Modification
FTS
WB
West Berkshire Council
1a, 1c and 1d Local Bus Services
· Published 07 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Infrastructure
Construction work· Published 07 Oct
CLOSED
13 Oct
£2.5m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Permanent Way
Construction work· Published 07 Oct
CLOSED
31 Oct
£500k
Estimated
Closed
CF
ST
Storm Tempest Ltd
CCHA Fire Door Replacement Project 25-26
Construction materials· Published 06 Oct
Page 124 of 8261
PreviousNext