PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
74
Open notices
Closing this week
463
Don’t miss
Open · all
2,928
Live opportunities
Posted · 24h
400
New notices
Posted · 30d
12,669
All notice types
Awarded · 7d
1,872
Market signal

Notice peek

×
BB
ClosedCF · 3e7ff942bcfd

Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV
Status
Closed
Estimated
£10.0m
Published
07 Feb 2025

Key facts

Notice ID
cf-86b23a2a-e291-4791-aba5-3e7ff942bcfd
CPV code
45262670 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Feb 2025

Description

WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas. 1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. 1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. 1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. 1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. 1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No. 1.1.1.7 Fire stops to the ceiling level - Approximately 720m. 1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. 1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. 1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. 1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. 1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. 1.1.1.13 Installation of approximately 760m of ceiling firestopping. 1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers. 1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope. Further details can be found on the attached document

You might also see

  • All Balfour Beatty VINCI Systra JV notices →
  • All Construction work notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 126 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
18 Nov
—
Estimated
Closed
CF
AA
Avon and Wiltshire Mental Health Partnership NHS trust
CA16562 - Alterations to BSW Female Crisis House
Construction work· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
RB
Rossendale Borough Council
Refurbishment of Shop Unit - 8 Trickett's Arcade, Waterfoot
· Published 07 Oct
CLOSED
14 Nov
£50k
Estimated
Closed
CF
FI
Falklands Islands Government Office
Strategic Review of the financial ICT systems and processes throughout Falkland Islands Government
Financial services· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
WB
West Berkshire Council
1a, 1c and 1d Local Bus Services
· Published 07 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353918 - Wood Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Nov
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353917 - Green Waste Recycling
Sewage & refuse· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
TE
The Education Training Collective
Media Advertising Agency - 2025
· Published 07 Oct
CLOSED
23 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA353914 - Plasterboard Recycling
Sewage & refuse· Published 07 Oct
CLOSED
31 Mar
—
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Short Breaks for Children and Young People with Disabilities and their Families (Re-opening)
Health & social· Published 07 Oct
CLOSED
15 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Replacement of Boundary Beacons at Castlelaw
Construction work· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Access Staircase
Installation services· Published 07 Oct
CLOSED
07 Oct
£12.0m
Estimated
Closed
CF
DC
Dorset Council
Road Surface Treatments - DPS
Construction materials· Published 07 Oct
CLOSED
07 Oct
—
Estimated
Modification
FTS
NE
NHS England
NHS England Cervical Screening Programme - HPV Self-Testing MSP procurement
· Published 07 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
WL
West London Waste Authority
Provision of Material Collection Services (MCS) for West London Waste Authority
Sewage & refuse· Published 07 Oct
CLOSED
13 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - GRP Access
Installation services· Published 07 Oct
CLOSED
13 Oct
£1.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Civil Engineering
Construction work· Published 07 Oct
CLOSED
13 Oct
£50k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 Devegetation Works
Construction work· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 E & P Works
Electrical machinery· Published 07 Oct
CLOSED
13 Oct
£100k
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 M & E works
Architecture & engineering· Published 07 Oct
CLOSED
13 Oct
£5.0m
Estimated
Closed
CF
KI
Kier Infrastructure and Overseas - CP7 NWC
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Construction work· Published 07 Oct
Page 126 of 8764
PreviousNext