PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
215
New notices
Posted · 30d
7,782
All notice types
Awarded · 7d
1,005
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 127 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
24 Oct
—
Estimated
Closed
CF
WS
West Suffolk NHS Foundation Trust
RM6116 Extreme Network
Radio & TV equipment· Published 02 Oct
CLOSED
12 Dec
—
Estimated
Closed
CF
KC
Kent County Council
SC240063 -Parent Infant Mental Health Service (PIMHS)
Health & social· Published 02 Oct
CLOSED
27 Oct
£500k
Estimated
Closed
CF
TU
The University of Northumbria at Newcastle
GB-Newcastle upon Tyne: T25-0005 Maintenance of Water Coolers
Electrical machinery· Published 02 Oct
CLOSED
07 Nov
£700k
Estimated
Closed
CF
GC
Gloucestershire County Council
Suicide Bereavement
Health & social· Published 02 Oct
CLOSED
15 Aug
£200k
Estimated
Closed
CF
WA
Westmorland and Furness Council
CWF Lot 2A - Lupton or Badgergate Bridge Repairs
Construction work· Published 02 Oct
CLOSED
02 Oct
—
Estimated
Modification
FTS
PS
PUBLIC SECTOR AUDIT APPOINTMENTS LIMITED
Audit Services for Opted-In Bodies
· Published 02 Oct
CLOSED
12 Oct
—
Estimated
Closed
CF
TO
The Office of the Police & Crime Commissioner
Single Tender Award for purchase of Pol-Ed
Education & training· Published 02 Oct
CLOSED
10 Oct
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Facilities management services
Business services· Published 02 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
SG
St. George The Martyr Church
Tender Opportunity: Design Team St George the Martyr - Securing the Legacy
Architecture & engineering· Published 02 Oct
CLOSED
09 Oct
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree planting and post planting maintenance
Repair & maintenance· Published 02 Oct
CLOSED
02 Oct
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree planting and post planting maintenance
Repair & maintenance· Published 02 Oct
CLOSED
14 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P4 Transformers, Switches and Sockets - HRS02 Tunnel and Lineside M&E
Electrical machinery· Published 02 Oct
CLOSED
14 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P9 Uninterrupted Power Supply System and Associated Cubicles - HRS02 Tunnel and Lineside M&E
Construction materials· Published 02 Oct
CLOSED
14 Oct
£500k
Estimated
Closed
CF
CG
Costain Group PLC
P14 Thermal Insulation- HRS02 Tunnel and Lineside M&E
Construction materials· Published 02 Oct
CLOSED
06 Nov
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Specialized vehicles
Transport equipment· Published 02 Oct
CLOSED
28 Oct
£130k
Estimated
Closed
CF
GM
General Medical Council (GMC)
Engaging members of the public and registrants in implementing regulatory reform
Business services· Published 01 Oct
CLOSED
24 Oct
£200k
Estimated
Closed
CF
BM
Brampton Manor Trust
Tunnel Repairs
Construction materials· Published 01 Oct
CLOSED
01 Oct
—
Estimated
Modification
FTS
NC
Nottingham City Council
District Heating Network Welding Framework
· Published 01 Oct
CLOSED
27 Oct
—
Estimated
Closed
CF
SW
SOUTH WEST ESSEX COMMUNITY EDUCATION TRUST LIMITED
CA16533 - South West Essex Community Education Trust - Building Cleaning Services
Sewage & refuse· Published 01 Oct
CLOSED
27 Oct
£1.0m
Estimated
Closed
CF
SE
South East Coast Ambulance Service NHS Foundation Trust
Medical Consumables and Equipment Open Tender
Medical equipment· Published 01 Oct
Page 127 of 8261
PreviousNext