PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
307
New notices
Posted · 30d
12,339
All notice types
Awarded · 7d
1,554
Market signal

Notice peek

×
KI
ClosedCF · 1b45119dec0c

Brewery Turnback - ES6-8 OLE Civilis / Foundations Works

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£5.0m
Published
07 Oct 2025

Key facts

Notice ID
cf-762aa637-505a-45ca-b6be-1b45119dec0c
CPV code
45234116 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Oct 2025

Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. OLE Scope of Work: The supply and installation and commissioning of new OLE foundations on the UP/ Down Rochdale Fast and on the new Turnback between Dalton Street and Miles Platting Junction (combination of piled, concrete pad, wall-mounted) This includes all hand back deliverables, such as redline drawings and attendance at AMP016 walkouts.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 128 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
10 Oct
£50k
Estimated
Closed
CF
NM
National Maritime Museum (NMM)
GB-London: PPMCC - Security Gates
Construction materials· Published 25 Sept
CLOSED
09 Oct
—
Estimated
Closed
CF
DC
DIGITAE CONSULTANCY SERVICES LTD
Medical Consumables and Breathalysers.
Clothing & footwear· Published 25 Sept
CLOSED
08 Oct
£500k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Matter Management solution
IT services· Published 25 Sept
CLOSED
25 Sept
£900k
Estimated
Closed
CF
CI
Chemonics International, Inc.
Expression of Interest/ Global South Strategic Communications Campaign
Business services· Published 25 Sept
CLOSED
26 Oct
—
Estimated
Closed
CF
NC
North Cumbria Integrated Care NHS Foundation Trust
NCIC - Milk & Bread
Food & beverages· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
HF
HERTS FOR LEARNING LIMITED
HFL Education - Management Information Systems - Open Framework
· Published 25 Sept
CLOSED
09 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P8 Fans and Associated Equipment - Costain HRS02 Tunnel and Lineside M&E
Furniture & furnishings· Published 25 Sept
CLOSED
09 Oct
£5.0m
Estimated
Closed
CF
CG
Costain Group PLC
P5 Lighting and Lighting Controls - HRS02 Tunnel and Lineside M&E
Electrical machinery· Published 25 Sept
CLOSED
09 Oct
£10.0m
Estimated
Closed
CF
CG
Costain Group PLC
P1 Brackets and Cable Management System - Costain HRS02 Tunnel and Lineside M&E
Electrical machinery· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
UI
UK Industrial Fusion Solutions Ltd
Detailed Design and Build of a Compound Cryogenic Pump Prototype (CCPP)
· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
AH
ateb Housing Group Ltd
ateb Renew Framework
· Published 25 Sept
CLOSED
25 Mar
£5.0m
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
UK Defence Training Estate Projects
Construction work· Published 25 Sept
CLOSED
25 Sept
—
Estimated
Modification
FTS
IO
Isle of Wight Council
Public Realm Works - East Cowes, Isle of Wight
· Published 25 Sept
CLOSED
12 Sept
£815k
Estimated
Closed
CF
HO
Home Office
DBS Occupational Health Services
Health & social· Published 25 Sept
CLOSED
23 Oct
—
Estimated
Closed
CF
UO
University of Bristol
Purchase of IR Detectors for School of Chemistry
Laboratory equipment· Published 25 Sept
CLOSED
22 Oct
—
Estimated
Closed
CF
NE
North East Ambulance Service
Consultancy opportunity - Estates advisory service for NEAS
Architecture & engineering· Published 25 Sept
CLOSED
17 Oct
£150k
Estimated
Closed
CF
PT
Padstow Town Council
Padstow South Dock Works
Construction work· Published 24 Sept
CLOSED
22 Oct
£1.4m
Estimated
Closed
CF
TW
Tyne & Wear Building Preservation Trust
The Tyre Shop Sunderland
Construction work· Published 24 Sept
CLOSED
30 Jul
£62.3m
Estimated
Closed
CF
BM
Barnsley Metropolitan Borough Council
Adult Community Support and Enablement Service Framework
Health & social· Published 24 Sept
CLOSED
26 Sept
—
Estimated
Closed
CF
CO
City of Wolverhampton College
RA353672 - Lenovo G4 Laptops, LapCabby lyte 20, Lenovo KB+Mouse and additional laptop power supplies
IT services· Published 24 Sept
Page 128 of 8261
PreviousNext