PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
278
New notices
Posted · 30d
10,443
All notice types
Awarded · 7d
1,287
Market signal

Notice peek

×
MO
ClosedCF · 6f6b4f7c63b6

Supply Chain Notice: WC1858011 - Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) (CYPRUS)

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
17 Dec 2025

Key facts

Notice ID
cf-5f0492c6-18f0-42bb-900b-6f6b4f7c63b6
CPV code
44114250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    17 Dec 2025

Description

Salt Lake Site (West & East) - Remedial Works Following Condition Survey of the Feeder Line Supports (Phase 1 - CIDP26) The basic requirement under Work Order WC1858011 focuses on repairing existing assets to extend their service life. - Clear vegetation at the area where the concrete bases are to be repaired in accordance with the directions provided by relevant stakeholders following relevant assessment and as below. Vegetation to be removed must be kept to the absolute minimum. - Contractor carrying out the works to liaise with Mitie QSHE Team prior to commencement of any works to assess the area. - Take out the existing electric cables located on existing steel feeder tray. - Place cables elsewhere to a safe location to avoid any damages during the reinstatement works. - Take down existing steel feeder tray (if any) and dispose waste material to license dipping site. - Install heavy duty hot dip galvanized cable tray with 260mm height and 1.2mm thickness to existing steel pole of feeder pole. Cable tray to be secured on steel pole using adjustable U-bolt bracket. Re-install associated cables with appropriate fixings (not plastic ty-wraps). - Excavate around feeder pole with hand digging. The depth of excavation shall be 600mm below ground level. Excavation to be kept to the absolute minimum required. - Clean the exposed concrete pole surface using rotary machine. - Apply cement based elastomeric waterproof coating to all exposed concrete surfaces of the existing feeder pole. - At the completion of cement elastomeric application, backfill and compact the excavate area with excavated soil material. Any excessive soil shall be delivered on licensed facilities for management. - Clean existing steel pole using power tools to grade of cleaning St 3 (Very thorough hand and power tools). The repairs need to be done according to the Grade of each asset: Grade 3 (Critical): Urgent local repairs - patching or jacketing of bases, reinforcement cleaning, bolt and tray replacements, and heavy recoating of steelwork. Grade 2 (Moderate): Selective repairs - concrete patching, localized steel plate strengthening, protective epoxy coatings, and timber preservative treatments. Grade 1 (Good): Preventive maintenance - cleaning, sealing, and protective surface treatments. The aim is to stabilize defects, slow deterioration, and preserve as much original structure as possible. The Provisional Key Tender dates for the project are as follows: - Expression of interest: Tuesday 16/12/2025 - Expression of interest return: Tuesday 23/12/2025 - Invitation to Tender: Thursday 08/01/2026 - Tender Return Date: Monday 09/02/2026 - Contract award: Friday 16/03/2026 - Commencement of work: Monday 31/08/2026 - Completion of work: Friday 25/09/2026 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces).

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 139 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
09 Sept
—
Estimated
Modification
FTS
WC
Weston College
On Demand Educational Transport
· Published 09 Sept
CLOSED
09 Sept
£30k
Estimated
Closed
CF
LC
Lincolnshire County Council
BPB000154 - Alternative Provision South - Taxi
Transport services· Published 09 Sept
CLOSED
09 Sept
—
Estimated
Modification
FTS
LC
Luton Council
AT1401 - Lamp Project Ensures Essential Mechanical Maintenance in Local Schools
· Published 09 Sept
CLOSED
06 Oct
—
Estimated
Closed
CF
MA
MAIDSTONE AND TUNBRIDGE WELLS NHS TRUST
Supply and install window blinds
Construction work· Published 09 Sept
CLOSED
09 Sept
—
Estimated
Modification
FTS
LC
Luton Council
AT1403 - LAMP Project for essential Electrical maintenance
· Published 09 Sept
CLOSED
09 Sept
£45k
Estimated
Closed
CF
LC
Lincolnshire County Council
BPB000153 - Alternative Provision (Pilgrim) South - Taxi
Transport services· Published 09 Sept
CLOSED
06 Oct
—
Estimated
Closed
CF
MA
MAIDSTONE AND TUNBRIDGE WELLS NHS TRUST
Lift Maintenance for Maidstone & Tunbridge Wells NHS Trust
Repair & maintenance· Published 09 Sept
CLOSED
09 Sept
—
Estimated
Modification
FTS
SD
South Derbyshire District Council
Rosliston Forestry Centre Doors and Glazing
· Published 09 Sept
CLOSED
07 Oct
—
Estimated
Closed
CF
HO
Home Office
Invitations of Applications - PAVA spray testing for Home Office Certification
Architecture & engineering· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Muck Away Haulage
Construction work· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Demolition Services M3J9
Construction work· Published 09 Sept
CLOSED
30 May
—
Estimated
Closed
CF
NH
National Highways
ITEP0979 - Adobe renewal
Software packages· Published 09 Sept
CLOSED
19 Sept
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
M3J9 Sprayed Concrete
Construction materials· Published 09 Sept
CLOSED
21 Aug
—
Estimated
Closed
CF
EA
Environment Agency
Salford Basin Footpath - NW DA 25/26
Construction work· Published 09 Sept
CLOSED
03 Oct
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Provision of broker services and medical insurance for the British High Commission in Port of Spain, Trinidad & Tobago
Financial services· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
LS
LONDON SOUTH BANK UNIVERSITY
Adult Skills Fund - Subcontractors and Partners
· Published 08 Sept
CLOSED
14 Dec
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
One Vision Housing - Asset Management Tender
Construction work· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
ND
North Devon District Council
Green Lanes Roofing Repairs Works
· Published 08 Sept
CLOSED
08 Sept
—
Estimated
Modification
FTS
TR
Two Rivers Housing
Fleet Replacement - Two Rivers Housing: ID612
· Published 08 Sept
CLOSED
03 Oct
£5.0m
Estimated
Closed
CF
PV
PAILTON VILLAGE CIC
GB-Pailton: White Lion Pailton Main Contractor Conservation and Repair Works Pre Qualification Questionnaire
Construction work· Published 08 Sept
Page 139 of 8261
PreviousNext