PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
173
New notices
Posted · 30d
7,165
All notice types
Awarded · 7d
914
Market signal

Notice peek

×
JM
ClosedCF · 8598f9747225

Greek Street - Deck Construction Works

J Murphy & Sons Limited
Status
Closed
Estimated
£1.0m
Published
07 Mar 2025

Key facts

Notice ID
cf-f9866d25-f8cb-4163-a678-8598f9747225
CPV code
45221112 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Mar 2025

Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 149 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
26 Aug
—
Estimated
Modification
FTS
KH
Karbon Homes
Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes
· Published 26 Aug
CLOSED
04 Sept
£55k
Estimated
Closed
CF
LB
London Borough of Haringey
FELIX BATCH 44 (Stair lifts only)
Construction work· Published 26 Aug
CLOSED
23 Sept
£5.0m
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
GB-Rayleigh, Essex: Transport services Manston, Kent.
Transport services· Published 26 Aug
CLOSED
26 Aug
—
Estimated
Modification
FTS
SH
South Holland District Council
Provision of Temporary Accommodation Services
· Published 26 Aug
CLOSED
01 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Street light maintenance Middleton Cheney Parish Council
Transport equipment· Published 25 Aug
CLOSED
29 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Grass Cutting Contract 2026-28 Middleton Cheney Parish Council
Agriculture & forestry· Published 25 Aug
CLOSED
29 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Grass Cutting Contract 2026-28 Middleton Cheney Parish Council
Agriculture & forestry· Published 25 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
KH
Karbon Homes
CA16372 - Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes
Construction work· Published 24 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
Rewire & Remedial Works (Void Properties)
Furniture & furnishings· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
BHA - Property Clearance & Clean
Construction work· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
General Building Works (Major Work Voids)
Construction work· Published 22 Aug
CLOSED
22 Nov
—
Estimated
Closed
CF
HA
Harper Adams University
CA16370 - EST0925 Metabolic dairy research unit re-fit works
Construction work· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Water Hygiene Management
Sewage & refuse· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Automatic opening vents/smoke control systems
Repair & maintenance· Published 22 Aug
CLOSED
09 Sept
£100k
Estimated
Closed
CF
UA
UK Atomic Energy Authority
Digital Infrastructure Training Simulator Consultancy
IT services· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Fire safety equipment servicing
Repair & maintenance· Published 22 Aug
CLOSED
15 Sept
£1
Estimated
Closed
CF
UH
UK HEALTH AND SECURITY AGENCY
PCR Sample Collection Kit Request for Information (RFI)
Laboratory equipment· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
CO
City of Wolverhampton College
CA16367 - City of Wolverhampton College - HR & Payroll Software
Software packages· Published 22 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
ND
NHS DORSET ICB
NHS DORSET - DORSET COMMUNITY OUTBREAK RESPONSE SERVICE (CORS) - EOI
Health & social· Published 22 Aug
CLOSED
22 Aug
—
Estimated
Modification
FTS
GB
Gedling Borough Council
Civic Centre and Arnot Hill Fire Door Remedials
· Published 22 Aug
Page 149 of 8261
PreviousNext