PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
193
New notices
Posted · 30d
7,185
All notice types
Awarded · 7d
925
Market signal

Notice peek

×
BP
ClosedCF · d8cd927998d9

BPA Capital Programme BP1

Britten Pears Arts
Status
Closed
Estimated
—
Published
12 Mar 2025

Key facts

Notice ID
cf-10a1e261-b645-4b72-85b9-d8cd927998d9
CPV code
45453100 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    12 Mar 2025

Description

Britten Pears Building (BP1) Full internal refurbishment including new mechanical and electrical services, new toilets and refurbished windows, excluding the Trask Café and Kitchen finishes. Construction of a new lift tower to enable enhanced access to upper floors, facilitated by partial wall and roof removal. Removal of the existing and installation of a new repositioned sprinkler tank in the service yard between the Britten Pears Building and the Concert Hall. General access improvements, including a new entrance ramp and passenger and equipment lift to all floors and the replacement and automation of the entrance doors. Conversion of the first floor practice rooms to provide seven larger multifunction studios/break out spaces. Creation of an accessible top floor multi-purpose activity space, created through internal reconfiguration of the Cranbrook Room. Thermal upgrades to fabric to reduce energy consumption. Transformation of the Peter Pears Recital room into flexible studio and refurbishment of its bleacher seating. Removal of the old technical room to create accessible seating areas. New lighting system, sound and video infrastructure including permanent lighting and AV control position. New wheelchair positions to the upper level and improved wheelchair access to the lower level. Installation of a backstage Technical AV infrastructure throughout the building. External soft and hard landscaping alterations including steps and ramps and car park resurfacing to enable the provision of 3 blue badge parking bays. Works to be carried out in accordance with ecological requirements, including a Reasonable Avoidance Measures (RAMs) Method Statement and Construction Environmental Management Plan (CEMP). Carpark and Landscaping (FLD2) This scope is split into three parts, and will include surface upgrades with resin bound gravel and parking bay markings to allow the provision of Blue Badge spaces, with associated lighting improvements. Upgrades will be to the following areas: North car parks, including the Craft Shop and pond-side car parks to North West of the Concert Hall South car park, the Paddock car park to the South East of the Britten Pears Building BPA is seeking a Principal Contractor to complete the above works. The procurement of the works will follow a two stage flexible competitive tender process consisting of the following: - Stage 1: Selection Questionnaire (PQQ), issued on the Central Digital Platform - Stage 2: Tender, issued to successful contractors following Stage 1.

You might also see

  • All Britten Pears Arts notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 149 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
26 Aug
—
Estimated
Modification
FTS
KH
Karbon Homes
Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes
· Published 26 Aug
CLOSED
04 Sept
£55k
Estimated
Closed
CF
LB
London Borough of Haringey
FELIX BATCH 44 (Stair lifts only)
Construction work· Published 26 Aug
CLOSED
23 Sept
£5.0m
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
GB-Rayleigh, Essex: Transport services Manston, Kent.
Transport services· Published 26 Aug
CLOSED
26 Aug
—
Estimated
Modification
FTS
SH
South Holland District Council
Provision of Temporary Accommodation Services
· Published 26 Aug
CLOSED
01 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Street light maintenance Middleton Cheney Parish Council
Transport equipment· Published 25 Aug
CLOSED
29 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Grass Cutting Contract 2026-28 Middleton Cheney Parish Council
Agriculture & forestry· Published 25 Aug
CLOSED
29 Sept
—
Estimated
Closed
CF
MC
Middleton Cheney Parish Council
Grass Cutting Contract 2026-28 Middleton Cheney Parish Council
Agriculture & forestry· Published 25 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
KH
Karbon Homes
CA16372 - Compartmentation Surveys & Works and General Fire Safety Rectification Work Framework for Karbon Homes
Construction work· Published 24 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
Rewire & Remedial Works (Void Properties)
Furniture & furnishings· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
BHA - Property Clearance & Clean
Construction work· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
BH
Broadacres Housing Association
General Building Works (Major Work Voids)
Construction work· Published 22 Aug
CLOSED
22 Nov
—
Estimated
Closed
CF
HA
Harper Adams University
CA16370 - EST0925 Metabolic dairy research unit re-fit works
Construction work· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Water Hygiene Management
Sewage & refuse· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Automatic opening vents/smoke control systems
Repair & maintenance· Published 22 Aug
CLOSED
09 Sept
£100k
Estimated
Closed
CF
UA
UK Atomic Energy Authority
Digital Infrastructure Training Simulator Consultancy
IT services· Published 22 Aug
CLOSED
23 Sept
—
Estimated
Closed
CF
CH
CLARION HOUSING GROUP LIMITED
Fire safety equipment servicing
Repair & maintenance· Published 22 Aug
CLOSED
15 Sept
£1
Estimated
Closed
CF
UH
UK HEALTH AND SECURITY AGENCY
PCR Sample Collection Kit Request for Information (RFI)
Laboratory equipment· Published 22 Aug
CLOSED
19 Sept
—
Estimated
Closed
CF
CO
City of Wolverhampton College
CA16367 - City of Wolverhampton College - HR & Payroll Software
Software packages· Published 22 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
ND
NHS DORSET ICB
NHS DORSET - DORSET COMMUNITY OUTBREAK RESPONSE SERVICE (CORS) - EOI
Health & social· Published 22 Aug
CLOSED
22 Aug
—
Estimated
Modification
FTS
GB
Gedling Borough Council
Civic Centre and Arnot Hill Fire Door Remedials
· Published 22 Aug
Page 149 of 8261
PreviousNext