PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,288
Live opportunities
Posted · 24h
167
New notices
Posted · 30d
5,669
All notice types
Awarded · 7d
740
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,488 noticesclosed · sorted by publication date
Page 15 of 8575
Time to close
Value
Type
Buyer
Notice
CLOSED
20 Apr
£30.0m
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Kier Infrastructure - Ground Investigation
Construction work· Published 16 Apr
CLOSED
20 Apr
£10.0m
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Kier Infrastructure - Archaeological trial trenching
Construction work· Published 16 Apr
CLOSED
16 Apr
£870k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Bramcote External Refurbishments to 21 properties - FY2026/27 - Amey Central Region - West
Construction work· Published 16 Apr
CLOSED
29 Apr
£120k
Estimated
Closed
CF
BH
Burnham-On-Sea & Highbridge Town Council
Christmas Lights and Decorations
Electrical machinery· Published 15 Apr
CLOSED
17 Apr
£75k
Estimated
Closed
CF
CC
Community Centre
Ground and associated works
Construction work· Published 15 Apr
CLOSED
30 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of сonstruction materials
Construction materials· Published 15 Apr
CLOSED
15 Apr
—
Estimated
Modification
FTS
SR
South Ribble Borough Council
Invitation to Tender for South Ribble Asylum and Refugee Support and Signposting Service
· Published 15 Apr
CLOSED
15 Apr
—
Estimated
Modification
FTS
CT
CELL THERAPY CATAPULT LIMITED
Braintree Security Service
· Published 15 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
CP
CRESCENT PURCHASING LIMITED
Corporate Software & Related Products and Services - ITT
· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
CP
CRESCENT PURCHASING LIMITED
Corporate Software & Related Products and Services - ITT
· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
CP
CRESCENT PURCHASING LIMITED
Corporate Software & Related Products and Services - ITT
· Published 14 Apr
CLOSED
23 Apr
£5.0m
Estimated
Closed
CF
SC
Sizewell C Limited
SZC - Waterproofing Materials
Construction work· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
LA
London Ambulance Service NHS Trust
YAS 308 2025_26 Commander Assessment and CPD Recording Platform
· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
GL
GREENSQUAREACCORD LIMITED
Hooks Close Lechlade Treatment Plant 2026
· Published 14 Apr
CLOSED
21 Apr
£1.0m
Estimated
Closed
CF
AJ
Anthro JV
Old Oak Common - Lighting Controller Ancillary Equipment (LGHT1)
Electrical machinery· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
PA
Police and Crime Commissioner for North Wales Police & North Wales Police
Mechanical and Electrical M&E Consultancy Services
· Published 14 Apr
CLOSED
24 Mar
—
Estimated
Closed
CF
NH
National Highways Limited
Awarded contract for ITEP0910 - MP Reporting Solutions Operate, Maintain and Continuous Improvement
Software packages· Published 14 Apr
CLOSED
14 Apr
£348k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Brecon External Refurbishments to 3 properties - FY2026/27 - Amey Central Region - Wales
Construction work· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
ER
East Riding of Yorkshire Council
Independent Advocacy Services 2026
· Published 14 Apr
CLOSED
14 Apr
—
Estimated
Modification
FTS
PA
Police and Crime Commissioner for North Wales Police & North Wales Police
M&E Consultancy Services
· Published 14 Apr
Page 15 of 8575
PreviousNext