PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
319
New notices
Posted · 30d
10,872
All notice types
Awarded · 7d
1,353
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 152 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
19 Sept
—
Estimated
Closed
CF
NA
National Army Museum
Tender for a Digital Asset Management System
Recreational & cultural· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
EB
Eastbourne Borough Council
Domestic Solar PV Group Purchasing Scheme
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
DF
Department for Education
Independent Complaints Adjudication Services for Ofsted
· Published 15 Aug
CLOSED
22 Aug
£5.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Routewide Framework Package - Personal Protective Equipment
Clothing & footwear· Published 15 Aug
CLOSED
21 Aug
—
Estimated
Closed
CF
HD
Hywel Dda University Health Board
RA352913 - Maintenance of Trophon Pobe Disinfection Units
Medical equipment· Published 15 Aug
CLOSED
01 Sept
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA352908 - Property Management Consultancy Service opportunities
Business services· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
UR
UK Research and Innovation
Ventilation Plant and Equipment Maintenance Services
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Closed
FTS · Services
FS
FINANCIAL SERVICES COMPENSATION SCHEME LIMITED
Supply of Temporary and Permanent Personnel Services (Master Vendor)
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
BC
Birmingham City University
Occupational Health Services for University Students
· Published 15 Aug
CLOSED
13 Feb
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Supply of Temporary and Permanent Personnel Services (Master Vendor)
Business services· Published 15 Aug
CLOSED
31 Aug
—
Estimated
Closed
CF
NF
Nottinghamshire Fire & Rescue Service
PRN004539 CFBT Ground work Pre-market Engagement
Construction work· Published 15 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712798451-Boats In Service Support 26 Lot 9 Support and Training Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712798450 - Boats In Service Support 26 Lot 8 UK Operations Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
24 Sept
—
Estimated
Closed
CF
MW
Merseyside Waste Disposal Authority
Sefton Meadows Road Bridge Remediation Works 2025-26
Construction work· Published 14 Aug
CLOSED
05 Sept
£300k
Estimated
Closed
CF
TE
The East Manchester Academy
On Site Provision - The East Manchester Academy
Education & training· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712797450 - Boats In Service Support 26 - Lot 7 Army Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712796450 - Boats In Service Support 26 Lot 6 Work Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712795451 - Boats In Service Support 26 Lot 5 P2000 Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
28 Aug
£500k
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Dismantling of Structure using Hydro-demolition & Repair FRC Strucuture
Construction work· Published 14 Aug
CLOSED
01 Sept
£1.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Soil surveys
Sewage & refuse· Published 14 Aug
Page 152 of 8261
PreviousNext