PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
262
New notices
Posted · 30d
8,369
All notice types
Awarded · 7d
1,090
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 153 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
15 Aug
—
Estimated
Modification
FTS
EB
Eastbourne Borough Council
Domestic Solar PV Group Purchasing Scheme
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
DF
Department for Education
Independent Complaints Adjudication Services for Ofsted
· Published 15 Aug
CLOSED
22 Aug
£5.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Routewide Framework Package - Personal Protective Equipment
Clothing & footwear· Published 15 Aug
CLOSED
21 Aug
—
Estimated
Closed
CF
HD
Hywel Dda University Health Board
RA352913 - Maintenance of Trophon Pobe Disinfection Units
Medical equipment· Published 15 Aug
CLOSED
01 Sept
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA352908 - Property Management Consultancy Service opportunities
Business services· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
UR
UK Research and Innovation
Ventilation Plant and Equipment Maintenance Services
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Closed
FTS · Services
FS
FINANCIAL SERVICES COMPENSATION SCHEME LIMITED
Supply of Temporary and Permanent Personnel Services (Master Vendor)
· Published 15 Aug
CLOSED
15 Aug
—
Estimated
Modification
FTS
BC
Birmingham City University
Occupational Health Services for University Students
· Published 15 Aug
CLOSED
13 Feb
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Supply of Temporary and Permanent Personnel Services (Master Vendor)
Business services· Published 15 Aug
CLOSED
31 Aug
—
Estimated
Closed
CF
NF
Nottinghamshire Fire & Rescue Service
PRN004539 CFBT Ground work Pre-market Engagement
Construction work· Published 15 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712798451-Boats In Service Support 26 Lot 9 Support and Training Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712798450 - Boats In Service Support 26 Lot 8 UK Operations Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
24 Sept
—
Estimated
Closed
CF
MW
Merseyside Waste Disposal Authority
Sefton Meadows Road Bridge Remediation Works 2025-26
Construction work· Published 14 Aug
CLOSED
05 Sept
£300k
Estimated
Closed
CF
TE
The East Manchester Academy
On Site Provision - The East Manchester Academy
Education & training· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712797450 - Boats In Service Support 26 - Lot 7 Army Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712796450 - Boats In Service Support 26 Lot 6 Work Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712795451 - Boats In Service Support 26 Lot 5 P2000 Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
28 Aug
£500k
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Dismantling of Structure using Hydro-demolition & Repair FRC Strucuture
Construction work· Published 14 Aug
CLOSED
01 Sept
£1.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Soil surveys
Sewage & refuse· Published 14 Aug
CLOSED
22 Aug
£500k
Estimated
Closed
CF
MD
Mace Dragados
Brickwork and Stonework to existing RCGP Building
Construction work· Published 14 Aug
Page 153 of 8261
PreviousNext