PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
190
New notices
Posted · 30d
10,068
All notice types
Awarded · 7d
1,209
Market signal

Notice peek

×
KT
ClosedCF · c50361b9fec8

Manchester International Airport - Temporary Works Piling Enabling Works

Kier Transportation - CP7 NWC
Status
Closed
Estimated
£500k
Published
10 Feb 2026

Key facts

Notice ID
cf-22a58595-1e7e-45f7-8219-c50361b9fec8
CPV code
44212400 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Feb 2026

Description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The piling mat location along S2 and S1 walls will need to be installed to accommodate the arrival of the SF95 CFA piling rigs. The excavation of material and installation of temporary works for the pile mats will be on 3rd party land belonging to the Clayton Hotel and MAG. - Clayton Hotel Wall Removal/Relocation and Reinstatement upon completion. - Remove Fencing - Piling Mat Installation (S1 134m, S2 194m) - Screw Piles - Stone up the area adjacent to the UU area (already deveged) - Install Railway access steps

You might also see

  • All Kier Transportation - CP7 NWC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 154 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
27 Aug
—
Estimated
Closed
CF
TF
Transport for London
TfL Supplementary Works Approval Process
IT services· Published 13 Aug
CLOSED
12 Sept
£600k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA16322 - Tender 12/2025 Belfast City Centre Regeneration Framework Lot 2.
Architecture & engineering· Published 13 Aug
CLOSED
08 Sept
—
Estimated
Closed
CF
SL
South London and Maudsley
NHS 111 Crisis Text Service
Health & social· Published 13 Aug
CLOSED
18 Sept
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Cargo Vans
Transport equipment· Published 13 Aug
CLOSED
27 Aug
£500k
Estimated
Closed
CF
SC
SKANSKA CONSTRUCTION UK LIMITED
Lower Thames Crossing - Kent Roads - Stage 1 works - Demolition
Construction work· Published 13 Aug
CLOSED
13 Aug
—
Estimated
Modification
FTS
WB
Wyre Borough Council
Bulky Waste Service
· Published 13 Aug
CLOSED
15 Aug
£20.0m
Estimated
Closed
CF
JM
J Murphy & Sons Limited
Marston BBM Scheme
Construction work· Published 13 Aug
CLOSED
15 Aug
£1.0m
Estimated
Closed
CF
JM
J Murphy & Sons Limited
Woburn BBM Scheme
Construction work· Published 13 Aug
CLOSED
15 Aug
£2.5m
Estimated
Closed
CF
AJ
Anthro JV
Driver Only Operation Railway Platform System
Printed matter· Published 13 Aug
CLOSED
18 Aug
£500k
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Guide Slab Demolition
Construction work· Published 13 Aug
CLOSED
29 Aug
£1.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - HVAC Supply
Industrial machinery· Published 13 Aug
CLOSED
29 Aug
£1.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Plant Equipment LOLER Inspections
Architecture & engineering· Published 13 Aug
CLOSED
13 Aug
—
Estimated
Closed
FTS · Works
NY
North Yorkshire County Council
Contract for a Principal Contractor for Scarborough Harbour West Pier Regeneration Works
Construction work· Published 13 Aug
CLOSED
03 Oct
£990k
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Hatherley Mews E17 4QP - Refurbishment
Construction work· Published 13 Aug
CLOSED
12 Aug
—
Estimated
Modification
FTS
NE
NORTH EAST LEARNING TRUST
Provision of Trust Careers Guidance
· Published 12 Aug
CLOSED
12 Aug
—
Estimated
Modification
FTS
ST
Sheffield Teaching Hospitals NHS Foundation Trust
STCH - Provision of Funeral Services
· Published 12 Aug
CLOSED
26 Aug
£90
Estimated
Closed
CF
HC
Highfields Centre
Invitation to Tender: Proposed Audio-Visual Upgrades
Radio & TV equipment· Published 12 Aug
CLOSED
26 Aug
£120
Estimated
Closed
CF
HC
Highfields Centre
Invitation to Tender: Proposed Photovoltaic (PV) Solar Panels
Petroleum & fuel· Published 12 Aug
CLOSED
20 Aug
—
Estimated
Closed
CF
MF
Musicability Foundation
MusicAbility Centre Phase 2
Construction work· Published 12 Aug
CLOSED
01 Sept
—
Estimated
Closed
CF
PI
PALLADIUM INTERNATIONAL LIMITED
Supporting Enhanced Governance Through the Brazil 2050 Strategy
Petroleum & fuel· Published 12 Aug
Page 154 of 8261
PreviousNext