PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
213
New notices
Posted · 30d
7,249
All notice types
Awarded · 7d
942
Market signal

Notice peek

×
JM
ClosedCF · 8598f9747225

Greek Street - Deck Construction Works

J Murphy & Sons Limited
Status
Closed
Estimated
£1.0m
Published
07 Mar 2025

Key facts

Notice ID
cf-f9866d25-f8cb-4163-a678-8598f9747225
CPV code
45221112 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Mar 2025

Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 155 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712775453 - Boats In-Service Support 26 LOT 1 - UKSTRATCOM Boats-CF
Repair & maintenance· Published 14 Aug
CLOSED
21 Aug
—
Estimated
Closed
CF
FE
FEDCAP EMPLOYMENT LIMITED
Fedcap_RFP_Ministry of Justice Commissioned Rehabilitative Services (CRS) - Supply Chain Partnerships
Financial services· Published 14 Aug
CLOSED
11 Sept
—
Estimated
Closed
CF
WL
West London Waste Authority
West London Waste Authority (WLWA): Digital Meal Planning Solution to Reduce Household Food Waste
Food & beverages· Published 14 Aug
CLOSED
06 May
£900k
Estimated
Closed
CF
UO
University of Bristol
CoSInC Forming Tool Suite
Industrial machinery· Published 14 Aug
CLOSED
14 Aug
—
Estimated
Modification
FTS
CT
Chepstow Town Council
Christmas Illuminations - Chepstow Town Council
· Published 14 Aug
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
712782450 - Boats In Service Support 26 - Lot 2 Royal Navy/Royal Fleet Auxiliary Boats - CF
Repair & maintenance· Published 14 Aug
CLOSED
04 Sept
£108k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA16324 - ITT 14/2025 - Biannual Service of oil-fired boilers and emergency breakdown cover
Repair & maintenance· Published 14 Aug
CLOSED
03 Sept
—
Estimated
Closed
CF
UO
University of Bristol
Goldney House (Bristol) Feasibility Study
Construction work· Published 14 Aug
CLOSED
14 Aug
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: TXN0048-01 Armory & PES relocation RIBA 2
Architecture & engineering· Published 14 Aug
CLOSED
19 Aug
£145k
Estimated
Closed
CF
CC
Cornwall Council
CFRS Critical Mobilising System & Equipment Support SLA
Security & defence· Published 13 Aug
CLOSED
27 Aug
—
Estimated
Closed
CF
TF
Transport for London
TfL Supplementary Works Approval Process
IT services· Published 13 Aug
CLOSED
12 Sept
£600k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA16322 - Tender 12/2025 Belfast City Centre Regeneration Framework Lot 2.
Architecture & engineering· Published 13 Aug
CLOSED
08 Sept
—
Estimated
Closed
CF
SL
South London and Maudsley
NHS 111 Crisis Text Service
Health & social· Published 13 Aug
CLOSED
18 Sept
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Cargo Vans
Transport equipment· Published 13 Aug
CLOSED
27 Aug
£500k
Estimated
Closed
CF
SC
SKANSKA CONSTRUCTION UK LIMITED
Lower Thames Crossing - Kent Roads - Stage 1 works - Demolition
Construction work· Published 13 Aug
CLOSED
13 Aug
—
Estimated
Modification
FTS
WB
Wyre Borough Council
Bulky Waste Service
· Published 13 Aug
CLOSED
15 Aug
£20.0m
Estimated
Closed
CF
JM
J Murphy & Sons Limited
Marston BBM Scheme
Construction work· Published 13 Aug
CLOSED
15 Aug
£1.0m
Estimated
Closed
CF
JM
J Murphy & Sons Limited
Woburn BBM Scheme
Construction work· Published 13 Aug
CLOSED
15 Aug
£2.5m
Estimated
Closed
CF
AJ
Anthro JV
Driver Only Operation Railway Platform System
Printed matter· Published 13 Aug
CLOSED
18 Aug
£500k
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Guide Slab Demolition
Construction work· Published 13 Aug
Page 155 of 8261
PreviousNext