PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
216
New notices
Posted · 30d
8,530
All notice types
Awarded · 7d
1,082
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 158 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
20 Aug
—
Estimated
Closed
CF
BA
Bournemouth and Poole College
CA16297 - Bournemouth and Poole College tender for Timber Supplies
Construction materials· Published 07 Aug
CLOSED
01 Sept
£500k
Estimated
Closed
CF
IA
Improvement and Development Agency for Local Government (IDeA)
GB-London: GIS training and data management for planners
R&D services· Published 07 Aug
CLOSED
07 Aug
—
Estimated
Modification
FTS
IB
Ipswich Borough Council
Supply of a woodchipper x 1
· Published 07 Aug
CLOSED
07 Aug
—
Estimated
Modification
FTS
TF
Transport for London
Dial a Ride Zero Emission Trial
· Published 07 Aug
CLOSED
07 Aug
—
Estimated
Closed
FTS · Supplies
TC
The City of Edinburgh Council
Supply of Graffiti Coating Product, Removal Product and Equipment
Chemical products· Published 07 Aug
CLOSED
15 Aug
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA352730 - Board Effectiveness Review
Business services· Published 07 Aug
CLOSED
07 Aug
—
Estimated
Modification
FTS
LC
Luton Council
AT1221 Passenger Transport Services - Approved Provider List
· Published 07 Aug
CLOSED
21 Aug
£750k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Electric Battery Floor Cleaning Machines (Sweepers & Scrubbers) with Support and Training
Furniture & furnishings· Published 07 Aug
CLOSED
07 Aug
—
Estimated
Modification
FTS
DB
Darlington Borough Council
Supporting Living Placement for ID358921
· Published 07 Aug
CLOSED
30 Jun
—
Estimated
Closed
CF
NC
Nottingham City Council
CPU 7789 St Anns-- Footway Works Sherwin Walk Call of from NCC CPU 5941 Planned Footpath & Cycleway Maintenance - Highways Managed
Construction work· Published 07 Aug
CLOSED
25 Aug
£25k
Estimated
Closed
CF
NY
North York Moors National Park Authority
Morra Head Farm, Harwood Dale
Agriculture & forestry· Published 06 Aug
CLOSED
22 Aug
£50k
Estimated
Closed
CF
TB
The Borough Council of Newcastle-under-Lyme
Monitoring of Legionella Bacteria in Water Systems 2025
Architecture & engineering· Published 06 Aug
CLOSED
06 Aug
—
Estimated
Modification
FTS
RB
Redditch Borough Council
THE SALE OF CARPENTRY SHOP MACHINERY AND EQUIPMENT
· Published 06 Aug
CLOSED
31 Aug
£500k
Estimated
Closed
CF
IA
Improvement and Development Agency for Local Government (IDeA)
GB-London: Planning Advisory Service Local Plan Project Management Support
Architecture & engineering· Published 06 Aug
CLOSED
06 Aug
—
Estimated
Closed
FTS · Services
NN
NHS Norfolk and Waveney Integrated Care Board
Tier 3 Weight Management Tender
Health & social· Published 06 Aug
CLOSED
01 Sept
£500k
Estimated
Closed
CF
IA
Improvement and Development Agency for Local Government (IDeA)
GB-London: Planning Advisory Service Local Plan Publication Readiness & Examination Support
Architecture & engineering· Published 06 Aug
CLOSED
22 Aug
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Post Tensioning Special Inspection
Construction work· Published 06 Aug
CLOSED
26 Aug
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of the specialised automotive and sewing equipment, tools and IT goods
Industrial machinery· Published 06 Aug
CLOSED
06 Aug
—
Estimated
Closed
FTS · Services
NB
NHS BRISTOL, NORTH SOMERSET AND SOUTH GLOUCESTERSHIRE INTEGRATED CARE BOARD
BNSSG ICB - Perinatal Mental Health Non-Statutory Community Services Redesign
· Published 06 Aug
CLOSED
29 Aug
£50k
Estimated
Closed
CF
SD
South Derbyshire District Council
Etwall Boiler Replacement V4SDDC021
Industrial machinery· Published 06 Aug
Page 158 of 8261
PreviousNext