PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
259
New notices
Posted · 30d
10,658
All notice types
Awarded · 7d
1,303
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 159 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
05 Aug
—
Estimated
Modification
FTS
EA
Environment Agency
Analysis of PFAS in TULAC
· Published 05 Aug
CLOSED
05 Aug
—
Estimated
Closed
FTS · Services
IO
Independent Office of Police Conduct
Managed WAN Services 2025 - New contract for existing Wide Area Network
· Published 05 Aug
CLOSED
30 Oct
—
Estimated
Closed
CF
AL
ADB (UK) LIMITED
CA16292 - Invitation to Tender (ITT) - Construction & Capital Works
Construction work· Published 05 Aug
CLOSED
05 Nov
—
Estimated
Closed
CF
BC
Blackpool Council
22 Fenton MAIN CONTRACT £15k - £400k BHC Building and Refurbishment Framework
Construction work· Published 05 Aug
CLOSED
03 Sept
—
Estimated
Closed
CF
TR
The Royal Borough of Windsor and Maidenhead Council
Community Based Domestic Abuse Support Service for RBWM Residents
Health & social· Published 05 Aug
CLOSED
05 Aug
—
Estimated
Modification
FTS
NE
Natural England
KSM Solar Pumps
· Published 05 Aug
CLOSED
09 Sept
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of vehicles
Transport equipment· Published 05 Aug
CLOSED
04 Sept
£8.1m
Estimated
Closed
CF
WA
Westmorland and Furness Council
Design and Demolition of the Indoor Market and Forum, Barrow in Furness
Construction work· Published 04 Aug
CLOSED
04 Aug
—
Estimated
Closed
CF
HE
Homes England (the name adopted by the Homes and Communities Agency)
Homes England - Development and Regeneration Technical Services Framework 2023-2027 - Andover
Architecture & engineering· Published 04 Aug
CLOSED
18 Aug
—
Estimated
Closed
CF
KC
Kirklees College
CA16288 - Kirklees College - Window Cleaning ITT
Sewage & refuse· Published 04 Aug
CLOSED
18 Aug
—
Estimated
Closed
CF
LB
London Borough of Hounslow
Consultancy Support - Options Appraisal for Enforcement Review
Supporting transport· Published 04 Aug
CLOSED
25 Aug
£9
Estimated
Closed
CF
CI
Chemonics International, Inc.
Major Repair of Stormwater Drainage Facility No. 1 on Kozatska Street, Novhorod-Siverskyi City, Chernihiv Oblast
Construction work· Published 04 Aug
CLOSED
05 Sept
—
Estimated
Closed
CF
CC
Chichester College Group
CA16289 - Resurfacing of the Existing Artificial Hockey Pitch
Construction work· Published 04 Aug
CLOSED
08 Sept
£50k
Estimated
Closed
CF
WF
Wyre Forest District Council
Temporary Accommodation - Preferred Supplier List - Round 2
Hotel & restaurant· Published 04 Aug
CLOSED
28 Aug
£1.0m
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Provision of White Goods
Furniture & furnishings· Published 04 Aug
CLOSED
01 Sept
£500k
Estimated
Closed
CF
CC
Colchester City Council
GB-Colchester: 0453 - PA - Voids Clearance Works
Construction work· Published 04 Aug
CLOSED
04 Aug
—
Estimated
Modification
FTS
IB
Ipswich Borough Council
Chapel Repairs Ipswich Old Cemetery
· Published 04 Aug
CLOSED
01 Aug
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: UHAF Power Generation Replacement incl. Building Construction
Industrial machinery· Published 01 Aug
CLOSED
12 Sept
—
Estimated
Closed
CF
SC
Somerset Council
External works will include roof replacement to the Manor House and adjoining flat roof, replacement glazing to dining area and link to Manor House. Future proofing of site will be implemented with an upgrade to supply and replacement of obsolete distribution board onsite. \n \n The Contractor is to refer to the Schedule of Works, Specifications and Tender Drawings for a full understanding of the works.
Construction work· Published 01 Aug
CLOSED
01 Aug
—
Estimated
Modification
FTS
LB
London Borough of Waltham Forest
Provision of Supported Housing for Single Homeless Adults
· Published 01 Aug
Page 159 of 8261
PreviousNext