PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
275
New notices
Posted · 30d
8,727
All notice types
Awarded · 7d
1,124
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 168 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
26 Aug
—
Estimated
Closed
CF
DC
DERBY CITY COUNCIL
TD2296 - The Provision of Bulk Mailing and Printing Services
Business services· Published 23 Jul
CLOSED
24 Sept
£26.4m
Estimated
Closed
CF
WA
Westmorland and Furness Council
Provision of Reactive, Statutory and Planned Maintenance Services for Corporate Properties
Repair & maintenance· Published 23 Jul
CLOSED
17 Aug
—
Estimated
Closed
CF
TR
The Royal Institute of British Architects
RIBA HOUSE OF ARCHITECTURE PROGRAMME - 66 PORTLAND PLACE ARCHITECTURE SHOP DESIGNER
Business services· Published 23 Jul
CLOSED
30 Jul
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Balfour Beatty - Roads North of the Thames-LTC -UXO Surveys
Security & defence· Published 23 Jul
CLOSED
20 Jun
£69k
Estimated
Closed
CF
RB
Royal Borough of Kingston Upon Thames
Cloud Infrastructure Consultancy Services 2025-2
IT services· Published 23 Jul
CLOSED
07 Aug
—
Estimated
Closed
CF
LB
London Borough of Hackney
Sexual Health Pathology Provision PIN
Health & social· Published 23 Jul
CLOSED
22 Jul
—
Estimated
Closed
FTS · Services
DA
Dumfries and Galloway Health Board
PROVISION OF PRIMARY MEDICAL SERVICES AT SOUTHERN MACHARS PRACTICE (Port William and Whithorn Practice Premises)
Health & social· Published 22 Jul
CLOSED
22 Aug
£800k
Estimated
Closed
CF
UH
University Hospitals of Morecambe Bay NHS Foundation Trust
POCT Bloodgas tender
Laboratory equipment· Published 22 Jul
CLOSED
21 Aug
—
Estimated
Closed
CF
NC
North Cumbria Integrated Care NHS Foundation Trust
Food To Go - NCIC
Food & beverages· Published 22 Jul
CLOSED
22 Jul
—
Estimated
Closed
FTS · Services
TG
The GRAB Trust (Group for Recycling in Argyll and Bute Trust Limited)
CivTech 11 - Challenge 11.3 - How can technology reduce the environmental and social impact of litter at Arrochar?
IT services· Published 22 Jul
CLOSED
22 Jul
—
Estimated
Closed
FTS · Services
SG
Scottish Government
How can innovation and technology improve things for people with long term health conditions starting with Musculoskeletal conditions, so they can engage with life and work as fully as possible?
· Published 22 Jul
CLOSED
22 Jul
—
Estimated
Modification
FTS
ES
East Suffolk Council
Occupational Health Services.
· Published 22 Jul
CLOSED
01 Aug
£50k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Gosport: OPA/T783 - Maintenance Service Contract for Deluge Valves and Systems
Repair & maintenance· Published 22 Jul
CLOSED
03 Apr
£52.0m
Estimated
Closed
CF
SL
Sellafield Limited
PICTS C1 - Service Desk and End User Support
IT services· Published 22 Jul
CLOSED
05 Aug
—
Estimated
Closed
CF
CC
Chichester College Group
RA352417 - Remedial works to man-safe equipment at Chichester College
Architecture & engineering· Published 22 Jul
CLOSED
22 Jul
—
Estimated
Closed
FTS · Services
EL
East Lothian Council
Licensing System
IT services· Published 22 Jul
CLOSED
22 Jul
—
Estimated
Modification
FTS
WC
Wirral Council
Provision of Cleaning Services at the Floral Pavilion Theatre and Conference Centre Wirral
· Published 22 Jul
CLOSED
01 Oct
£250k
Estimated
Closed
CF
BH
Bar Hill Parish Council
Saxon Park Skate Park Bar Hill
Construction work· Published 22 Jul
CLOSED
05 Aug
—
Estimated
Closed
CF
MA
MAIDSTONE AND TUNBRIDGE WELLS NHS TRUST
Fire Compartment
Installation services· Published 22 Jul
CLOSED
30 Jul
£50k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Gosport: OPA/T781 - Service Maintenance Contract for Fire and Gas Panel
Repair & maintenance· Published 22 Jul
Page 168 of 8261
PreviousNext