PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
278
New notices
Posted · 30d
10,443
All notice types
Awarded · 7d
1,287
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 169 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
24 Apr
—
Estimated
Closed
CF
NL
NEUPC Ltd
Engineering & Textiles Machines, Ancillary Products, Materials & Consumables
Industrial machinery· Published 21 Jul
CLOSED
25 Jul
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree works operations
Repair & maintenance· Published 21 Jul
CLOSED
04 Aug
—
Estimated
Closed
CF
NN
North Northamptonshire Council
North Northamptonshire Council - Residential and Nursing Care Homes Services (DPS) Reopening
Health & social· Published 21 Jul
CLOSED
21 Aug
—
Estimated
Closed
CF
CP
Chedgrave Parish Council
Pits Play Area Refurbishment
Musical instruments· Published 21 Jul
CLOSED
03 Aug
£250k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Paints and Coatings
Construction materials· Published 21 Jul
CLOSED
21 Jul
—
Estimated
Modification
FTS
IO
Isle of Wight Council
Hydraulic Systems Maintenance for Floating Bridge 6
· Published 21 Jul
CLOSED
31 Aug
—
Estimated
Closed
CF
MD
Mike Deegan Consulting
ITT for Landscape Maintenance Services 2026-2031
Agriculture & forestry· Published 20 Jul
CLOSED
08 Aug
—
Estimated
Closed
CF
KT
Keighley Town Council
Town Centre Summer Floral Displays
Agricultural products· Published 20 Jul
CLOSED
11 Aug
—
Estimated
Closed
CF
SB
Spelthorne Borough Council
CA16225 - Fordbridge Community Centre, Servery Alteration Project
Construction work· Published 18 Jul
CLOSED
18 Jul
—
Estimated
Closed
FTS · Supplies
N
NWUPC
Engineering & Textiles Machines, Ancillary Products, Materials & Consumables
Mining machinery· Published 18 Jul
CLOSED
01 Aug
£100k
Estimated
Closed
CF
UA
UK Atomic Energy Authority
SPOT Arm Haptic Controller Hardware
Industrial machinery· Published 18 Jul
CLOSED
01 Aug
—
Estimated
Closed
CF
SL
SERCO LIMITED
High Performance Initial Teacher Training
Education & training· Published 18 Jul
CLOSED
18 Jul
—
Estimated
Modification
FTS
FF
FAIR4ALL FINANCE LIMITED
Financial Capability Lead
· Published 18 Jul
CLOSED
15 Aug
—
Estimated
Closed
CF
CW
Cornwall Wildlife Trust
Breney Common - Stock fence replacement
Recreational & cultural· Published 18 Jul
CLOSED
28 Aug
—
Estimated
Closed
CF
CT
Crowborough Town Council
Christmas Lights for Crowborough Three year contract
Electrical machinery· Published 18 Jul
CLOSED
28 Aug
—
Estimated
Closed
CF
CT
Crowborough Town Council
Crowborough Fireworks 2026-2029
Chemical products· Published 18 Jul
CLOSED
18 Aug
£500k
Estimated
Closed
CF
FC
Forestry Commission FC
GB-Bristol: Plant and Seed Supply Nursery Management Software
Software packages· Published 18 Jul
CLOSED
10 Sept
—
Estimated
Closed
CF
HT
Harpenden Town Council
Demolition of Pavilions and extension of parking area
Construction work· Published 18 Jul
CLOSED
01 Aug
—
Estimated
Closed
CF
SO
States of Guernsey
REQUEST FOR INFORMATION (RFI) - Provision of an Offender Case Management System for Probation Services
Software packages· Published 18 Jul
CLOSED
18 Jul
—
Estimated
Modification
FTS
NE
Natural England
Littoral Sediment Surveys of Adur Estuary SSSI
· Published 18 Jul
Page 169 of 8261
PreviousNext