PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
227
New notices
Posted · 30d
9,942
All notice types
Awarded · 7d
1,212
Market signal

Notice peek

×
KC
ClosedCF · b93f9f148938

Attenuation Precast Tanks

Kilnbridge Construction Services Ltd
Status
Closed
Estimated
£1.0m
Published
04 Sept 2025

Key facts

Notice ID
cf-9c4a1667-7de9-41c2-8bab-b93f9f148938
CPV code
51810000 · Installation services
Source
Contracts Finder

Timeline

  1. Published
    04 Sept 2025

Description

Kilnbridge have secured the HS2 Old Oak Common Station Works Package for the construction of Urban Realm elements and the Head Houses and Ancillary Buildings. Part of these works require the installation of two, precast concrete attenuation tanks to the eastern part of the site. These tanks are a Subcontractor's design portion. Eastern HS2 Attenuation Tank • Area 1115m2 • Volume 1165m3 • Tank Depth 1.1m • Void Ratio 0.95 Eastern HS2 Dirty Water Tank • Area 1115m2 • Volume 350m3 • Tank Depth 1.6m • Void Ratio 0.95 Kilnbridge are seeking the services of suitably qualified and experienced Sub-subcontractor who shall be responsible for developing the Contractors Detailed Design to Design for Construction & Manufacturing. Taking from RIBA 4 to RIBA 5 stage. The Sub-subcontractor shall be responsible for providing their own design and design for construction drawings, compliant with the design intent of the Contractors Designer. The Sub-subcontractor will be responsible for ensuring the submission and acceptance of their design from the Contractor and Contractor's design consultant through the Subcontractor. Works include the design , manufacture and supply of precast base, walls and roof units to site. Scope to include for, but not limited to, technical assurance, BIM modelling, asset scheduling and labelling, drawings for approval, as built drawings, indicative construction sequence methodology, submission of design packs, material approvals, and sustainability and environmental management. Sub-subcontractor to interface their design with incoming services as detailed on the construction drawings. Construction is currently forecasted to be carried Q2 2026

You might also see

  • All Kilnbridge Construction Services Ltd notices →
  • All Installation services notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 180 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
03 Jul
—
Estimated
Modification
FTS
DF
Department for Work & Pensions
Request for Information (RFI) - Language Services
· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Structural Steelwork
Construction work· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Bat Mitigation
Construction work· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Relocation of NRTS Cables
Radio & TV equipment· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
DC
DERBY CITY COUNCIL
D2N2 Supported Accommodation Provider Engagement Event
Other services· Published 03 Jul
CLOSED
17 Jul
£500k
Estimated
Closed
CF
TC
The Corporate Officer of the House of Lords and The Corporate Officer of the House of Commons
FWK4002 - Provision of Fruit and Vegetables
Food & beverages· Published 03 Jul
CLOSED
17 Jul
£2.3m
Estimated
Closed
CF
TC
The Corporate Officer of the House of Lords and The Corporate Officer of the House of Commons
FWK4001 - Provision of Fresh Fish & Seafood
Food & beverages· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Bird Netting/ Tree Netting
Furniture & furnishings· Published 03 Jul
CLOSED
18 Jul
—
Estimated
Closed
CF
HT
Horley Town Council
Pavilion Replacement Windows
Construction materials· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Vehicle Restraint Systems
Transport equipment· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Devegetation
Construction work· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Propping
Construction materials· Published 03 Jul
CLOSED
10 Jul
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Repairs to existing expansion/bridge Joints
Construction work· Published 03 Jul
CLOSED
10 Apr
£146k
Estimated
Closed
CF
LB
London Borough of Merton
Gartner Research Services
R&D services· Published 03 Jul
CLOSED
03 Jul
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Ministry of Defence (MOD) Industry Day for the procurement of Service Management for PICASSO (SM4P) Services (formerly F-ITSM)
IT services· Published 03 Jul
CLOSED
03 Jul
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Ministry of Defence (MOD) further information for the procurement of Service Management for PICASSO (SM4P) Services (formerly F-ITSM)
IT services· Published 03 Jul
CLOSED
01 Aug
£200k
Estimated
Closed
CF
DF
Department for Science, Innovation & Technology
AISI Challenge Fund Grant
R&D services· Published 03 Jul
CLOSED
14 Jul
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Balfour Beatty - Roads North of the Thames-LTC - Track Matting
Construction materials· Published 03 Jul
CLOSED
03 Jul
—
Estimated
Modification
FTS
BC
Borough Council of Kings Lynn and West Norfolk
The Design, Supply and Installation of Lockers, Inc Removal and Disposal of Existing Lockers and Making Good
· Published 03 Jul
CLOSED
03 Jul
—
Estimated
Closed
FTS · Services
SH
Southdown Housing Association
Southside Housing Association - EICR's
Repair & maintenance· Published 03 Jul
Page 180 of 8261
PreviousNext