PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
243
New notices
Posted · 30d
9,299
All notice types
Awarded · 7d
1,158
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 186 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
26 Jun
—
Estimated
Closed
FTS · Services
CS
Cyngor Sir Ceredigion County Council
Cylch Caron Housing & Integrated Resource Centre Scheme Delivery Partner
Construction work· Published 26 Jun
CLOSED
26 Jun
—
Estimated
Closed
FTS · Services
SB
Scottish Borders Council
Berwickshire Taxi Bus DRT
· Published 26 Jun
CLOSED
26 Jun
—
Estimated
Closed
FTS · Supplies
NC
Newcastle City Council
Aggregates and Concrete
· Published 26 Jun
CLOSED
11 Jul
—
Estimated
Closed
CF
SO
ST OSYTH PRIORY & PARISH TRUST
Activity Plan, Community Consultation & Co-Production Consultant
Business services· Published 26 Jun
CLOSED
26 Jun
—
Estimated
Closed
FTS · Works
MC
Midlothian Council
Stobhill Waste Facility - extension to Recycling Centre (C573)
Construction work· Published 26 Jun
CLOSED
25 Jul
£200k
Estimated
Closed
CF
OU
Oxford University Hospitals NHS Trust
Wellbeing Projects - Horton Changing Rooms
Construction work· Published 25 Jun
CLOSED
03 Jul
—
Estimated
Closed
CF
WH
West Herts College
RA351821 - WHC - ICT infrastructure
Office & computing· Published 25 Jun
CLOSED
25 Jun
—
Estimated
Closed
FTS · Works
CC
City & County of Swansea
Framework for Capital Building Works
Construction work· Published 25 Jun
CLOSED
23 Jul
—
Estimated
Closed
CF
YL
YORWASTE LIMITED
Supply, Delivery & Servicing Of Up To 8 x Tractor Units
Transport equipment· Published 25 Jun
CLOSED
15 Jul
—
Estimated
Closed
CF
HC
Hartlepool College of Further Education
CA16078 - Hartlepool College of Further Education - Website Development and Maintenance
IT services· Published 25 Jun
CLOSED
25 Jun
£13.0m
Estimated
Closed
CF
LB
London Borough of Hackney
Commissioning Children's Homes in Hackney for Children Looked After
Health & social· Published 25 Jun
CLOSED
23 Jul
—
Estimated
Closed
CF
YL
YORWASTE LIMITED
Supply, Delivery & Servicing Of Telescopic Material Handler
Industrial machinery· Published 25 Jun
CLOSED
25 Jun
—
Estimated
Modification
FTS
TH
The Howard Partnership Trust
Howard Partnership Trust - Fixed Gas Supply Products
· Published 25 Jun
CLOSED
23 Jul
—
Estimated
Closed
CF
YL
YORWASTE LIMITED
Supply, Delivery & Servicing Of Up To Two Wheeled Loading Shovels
Industrial machinery· Published 25 Jun
CLOSED
29 Jun
£78k
Estimated
Closed
CF
CC
Cornwall Council
Citrix Software 30/06/2025 - 29/06/2026
Software packages· Published 25 Jun
CLOSED
24 Apr
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Hampshire Schools Cluster 6 - Catering Services Tender
Hotel & restaurant· Published 25 Jun
CLOSED
09 Jul
—
Estimated
Closed
CF
CC
Chichester College Group
RA351801 - Chichester College Motor Vehicle Equipment
Construction work· Published 25 Jun
CLOSED
25 Jun
—
Estimated
Closed
FTS · Services
MJ
Marchwood Junior School
Hampshire Schools Cluster 6 - Catering Services Tender
· Published 25 Jun
CLOSED
26 Jun
—
Estimated
Closed
CF
CC
Chichester College Group
RA351800 - Chichester College- Composites equipment
Medical equipment· Published 25 Jun
CLOSED
08 Jul
—
Estimated
Closed
CF
CC
Chichester College Group
RA351798 - Chichester College CAD CAM Equipment
Education & training· Published 25 Jun
Page 186 of 8261
PreviousNext