PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
282
New notices
Posted · 30d
9,585
All notice types
Awarded · 7d
1,202
Market signal

Notice peek

×
KI
ClosedCF · 1b45119dec0c

Brewery Turnback - ES6-8 OLE Civilis / Foundations Works

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£5.0m
Published
07 Oct 2025

Key facts

Notice ID
cf-762aa637-505a-45ca-b6be-1b45119dec0c
CPV code
45234116 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Oct 2025

Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. OLE Scope of Work: The supply and installation and commissioning of new OLE foundations on the UP/ Down Rochdale Fast and on the new Turnback between Dalton Street and Miles Platting Junction (combination of piled, concrete pad, wall-mounted) This includes all hand back deliverables, such as redline drawings and attendance at AMP016 walkouts.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 207 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
25 Jun
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Provision of Medical aid insurance services at British Embassy Juba, South Sudan
Health & social· Published 26 May
CLOSED
26 May
—
Estimated
Modification
FTS
BC
BRITISH COUNCIL(THE)
Computer Based Testing Venue Hire for British Council, Cassablanca
· Published 26 May
CLOSED
20 Jun
£20k
Estimated
Closed
CF
SW
STAFFORDSHIRE WILDLIFE TRUST LIMITED
Invitation to quote for Repairs to Dry Stone Bridge
Construction materials· Published 25 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Cable Maintenance and Fault Repair Services
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Speed Awareness Courses
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Composite Conductor Rails and Components
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Waterloo Platform Train Interface Design and Build
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Remedial (Enabling) Works for Station UPSs (Uninterruptible Power Supply)
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
London Councils Taxicard and Dial-a-Ride Taxi, Private Hire
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Employee Benefits Scheme
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Bespoke Plastic, Rubber and Composite Components
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Fast Setting Concrete
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
High Volume and Graduate Schemes
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Kingsland Road Arches Development Works
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London - Commercial Estate Minor Works Framework
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London Facilities Management
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Newbury Park Development
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Cloud Hosting Platform
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Victoria Coach Station - Coach Management System
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Adhesion Traction Gel
· Published 23 May
Page 207 of 8261
PreviousNext