PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
241
New notices
Posted · 30d
9,853
All notice types
Awarded · 7d
1,210
Market signal

Notice peek

×
BG
ClosedCF · 3fc263e309cb

Asset wide BMS Upgrade in Diplomatic Mission

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
22 Apr 2025

Key facts

Notice ID
cf-1ed82c07-c877-48cf-855c-3fc263e309cb
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    22 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 207 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
25 Jun
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Provision of Medical aid insurance services at British Embassy Juba, South Sudan
Health & social· Published 26 May
CLOSED
26 May
—
Estimated
Modification
FTS
BC
BRITISH COUNCIL(THE)
Computer Based Testing Venue Hire for British Council, Cassablanca
· Published 26 May
CLOSED
20 Jun
£20k
Estimated
Closed
CF
SW
STAFFORDSHIRE WILDLIFE TRUST LIMITED
Invitation to quote for Repairs to Dry Stone Bridge
Construction materials· Published 25 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Cable Maintenance and Fault Repair Services
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Speed Awareness Courses
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Composite Conductor Rails and Components
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Waterloo Platform Train Interface Design and Build
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Remedial (Enabling) Works for Station UPSs (Uninterruptible Power Supply)
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
London Councils Taxicard and Dial-a-Ride Taxi, Private Hire
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Employee Benefits Scheme
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Bespoke Plastic, Rubber and Composite Components
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Fast Setting Concrete
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
High Volume and Graduate Schemes
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Kingsland Road Arches Development Works
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London - Commercial Estate Minor Works Framework
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London Facilities Management
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Newbury Park Development
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Cloud Hosting Platform
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Victoria Coach Station - Coach Management System
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Adhesion Traction Gel
· Published 23 May
Page 207 of 8261
PreviousNext