PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
242
New notices
Posted · 30d
8,280
All notice types
Awarded · 7d
1,074
Market signal

Notice peek

×
JM
ClosedCF · 8598f9747225

Greek Street - Deck Construction Works

J Murphy & Sons Limited
Status
Closed
Estimated
£1.0m
Published
07 Mar 2025

Key facts

Notice ID
cf-f9866d25-f8cb-4163-a678-8598f9747225
CPV code
45221112 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Mar 2025

Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 208 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Waterloo Platform Train Interface Design and Build
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Remedial (Enabling) Works for Station UPSs (Uninterruptible Power Supply)
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
London Councils Taxicard and Dial-a-Ride Taxi, Private Hire
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Employee Benefits Scheme
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Bespoke Plastic, Rubber and Composite Components
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Fast Setting Concrete
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
High Volume and Graduate Schemes
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Kingsland Road Arches Development Works
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London - Commercial Estate Minor Works Framework
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Places for London Facilities Management
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
PF
Places for London Limited
Newbury Park Development
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Cloud Hosting Platform
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Victoria Coach Station - Coach Management System
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Pan Fleet Adhesion Traction Gel
· Published 23 May
CLOSED
24 Jun
—
Estimated
Closed
CF
TU
THE UNIVERSITY OF WESTMINSTER
Grounds Maintenance Services 2025.
Agriculture & forestry· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
SC
Southampton City Council
PROVISION OF VOIDS AND MAJOR REPAIRS
· Published 23 May
CLOSED
20 Jun
—
Estimated
Closed
CF
TN
THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
National Trust - Gorge Walk Restoration - Phase 3
Construction work· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Venues for the counting of the votes for the 2028 Greater London Authority elections
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Design, print, distribution and project management for the 2028 GLA elections ballot papers
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA Cleaning and Porterage, Including Pest Control and Windows
· Published 23 May
Page 208 of 8261
PreviousNext