PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
187
New notices
Posted · 30d
9,889
All notice types
Awarded · 7d
1,190
Market signal

Notice peek

×
BG
ClosedCF · 3fc263e309cb

Asset wide BMS Upgrade in Diplomatic Mission

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
22 Apr 2025

Key facts

Notice ID
cf-1ed82c07-c877-48cf-855c-3fc263e309cb
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    22 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 208 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
24 Jun
—
Estimated
Closed
CF
TU
THE UNIVERSITY OF WESTMINSTER
Grounds Maintenance Services 2025.
Agriculture & forestry· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
SC
Southampton City Council
PROVISION OF VOIDS AND MAJOR REPAIRS
· Published 23 May
CLOSED
20 Jun
—
Estimated
Closed
CF
TN
THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
National Trust - Gorge Walk Restoration - Phase 3
Construction work· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Venues for the counting of the votes for the 2028 Greater London Authority elections
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Design, print, distribution and project management for the 2028 GLA elections ballot papers
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA Cleaning and Porterage, Including Pest Control and Windows
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Liquid Nitrogen
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA City Hall, Trafalgar Square and Parliament Square Gardens Infrastructure Services
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA Broadcast and Audio-Visual Services
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Telemedicine and Virtual Ward Services
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
New Years Eve Event Framework 2026-2029
· Published 23 May
CLOSED
05 Jun
—
Estimated
Closed
CF
HD
Hywel Dda University Health Board
RA350842 - Maintenance of Stress Test Systems/Cardiology Treadmills
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Euro 2028 Fan Zones
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Over-labelled Medicines Framework
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA E-Counting Ballot System 2028
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Integrated Dental Care
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Wholesale Pharmaceutical Framework
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
72TS Bogie Damper Overhaul Bakerloo Line Tender
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
92TS Manufacture and Supply of Body End Panels
· Published 23 May
CLOSED
09 Jun
£500k
Estimated
Closed
CF
LG
Local Government Association
GB-London: Collaborative Design of a Future Operating Model
IT services· Published 23 May
Page 208 of 8261
PreviousNext