PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,310
Live opportunities
Posted · 24h
153
New notices
Posted · 30d
5,600
All notice types
Awarded · 7d
725
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,539 noticesclosed · sorted by publication date
Page 21 of 8577
Time to close
Value
Type
Buyer
Notice
CLOSED
30 Apr
—
Estimated
Closed
CF
TW
The Windsor Forest Colleges Group
CA17507 - WFCG - Student Transport Services
Transport services· Published 01 Apr
CLOSED
01 Apr
—
Estimated
Modification
FTS
TB
Tewkesbury Borough Council
Tewkesbury Market Operator
· Published 01 Apr
CLOSED
01 Apr
—
Estimated
Modification
FTS
PF
Places for People Group
IT Service Management tool (ITSM)
· Published 01 Apr
CLOSED
23 Apr
£150k
Estimated
Closed
CF
EB
Elmbridge Borough Council
Weybridge Centre - Roof Renewal Project
Construction materials· Published 01 Apr
CLOSED
01 Apr
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Wittering External Refurbishments to 66 properties - FY2026/27 - Amey Central Region - East Midlands & Nth
Construction work· Published 01 Apr
CLOSED
01 Apr
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Waddington External Refurbishments to 91 properties - FY2025/26 - Amey Central Region - East Mids & North
Construction work· Published 01 Apr
CLOSED
01 Apr
£348k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Irvine External Refurbishment to 17 properties - FY2026/27 - Amey North Region - Scotland
Construction work· Published 01 Apr
CLOSED
01 Apr
£870k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Cranwell External refurbishments 44 SFA - FY2026/27 - Amey Central Region - East Midlands
Construction work· Published 01 Apr
CLOSED
31 Mar
—
Estimated
Modification
FTS
TC
The Crown Estate
Westwick Row - Main Contractor Design & Construction Works
· Published 31 Mar
CLOSED
08 May
£125k
Estimated
Closed
CF
DP
Detling Parish Council
Provision to install new playground and recreational equipment
Recreational & cultural· Published 31 Mar
CLOSED
21 Apr
£150k
Estimated
Closed
CF
RD
Rotherham Doncaster and South Humber NHS Foundation Trust
Courtyard refurbishments in 2 lots. Lot 1 Scunthorpe, DN16 2JX, Lot 2 Rotherham
Construction work· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Modification
FTS
NM
NEXUS MULTI ACADEMY TRUST
Framework Agreement for ICT Products, Solutions, Services and Support
· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Modification
FTS
TF
Transport for London
Water Mist Suppression System Replacement
· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Modification
FTS
NW
NHS Wales Shared Services Partnership (hosted by Velindre University NHS Trust)
ENT PATIENT ASSESSMENT & EXAMINATION CONSUMABLES
· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Modification
FTS
TB
Tewkesbury Borough Council
Design and construction of a new metal footbridge, suitable for foot and cycle traffic
· Published 31 Mar
CLOSED
24 Apr
—
Estimated
Closed
CF
ML
Magenta Living
ML2026/010 - Extra Care Cleaning
Sewage & refuse· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Modification
FTS
DC
Derry City and Strabane District Council
T25-159HCO Leisure Centre Equipment
· Published 31 Mar
CLOSED
31 Mar
—
Estimated
Closed
CF
LB
London Borough of Merton
Employer's Agent services
Real estate· Published 31 Mar
CLOSED
28 Apr
—
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA17489 - Tender 39/2025 - Drumaness Mills Football Club - Walking Trail Works PP2008
Construction work· Published 31 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
RK
Red Kite Community Housing
Internal Audit Services
· Published 30 Mar
Page 21 of 8577
PreviousNext