PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
211
New notices
Posted · 30d
8,423
All notice types
Awarded · 7d
1,071
Market signal

Notice peek

×
JM
ClosedCF · 8598f9747225

Greek Street - Deck Construction Works

J Murphy & Sons Limited
Status
Closed
Estimated
£1.0m
Published
07 Mar 2025

Key facts

Notice ID
cf-f9866d25-f8cb-4163-a678-8598f9747225
CPV code
45221112 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Mar 2025

Description

Greek Street Bridge is a two span post tensioned structure in which the latest PTSI assessment concluded that the structure is understrength and overstressed. Engineering standard NR/CIV/025 has been used to manage the substandard structure in the short term with additional monitoring in place. Specific elements of concern included exposed concrete reinforcement which has begun to corrode on the deck soffit, seepage of water onto the soffit which will cause degradation to accelerate further. The most recent assessment report stated that the risk of failure was 'High' to 'Very High' and that deck replacement is required in 2025, otherwise the structure would need to be closed to road traffic until completely reconstructed, due to the overstress and deterioration it would not be safe to operate. The project proposal is to replace the existing bridge with a single span removing the central pier in a 21 day core possession in August 2025. This will require alterations to the existing OLE equipment that runs underneath the structure. The highway will also be closed for a significant period whilst construction works are undertaken to replace the bridge - circa 50 weeks. The deck construction works will commence once all beams are landed, connected and waterproofing membrane is installed. The sub-contractor will then be responsible for setting up all formwork and erecting steel re-enforcement (Opportunity to construct in cages may arise during design development, but please assume in-situ at this stage). Sub-contractor to then provide 2no. concrete pumps for duration of their pouring works. Sub-contractor to also finish concrete. The scope of work included in this Subcontract includes but is not limited to provision of all resources required to undertake the following items of work in accordance with the requirements of the Subcontract other that the items which the Schedule of Attendances specifically identify as being provided by the Main Contractor.

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 213 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
09 Jun
—
Estimated
Closed
CF
TC
Tameside College
CA15817 - Refurbishment & Teaching Space Conversion of Medlock Building, Phases 1 & 2
Construction work· Published 16 May
CLOSED
16 Jun
—
Estimated
Closed
CF
KH
Karbon Homes
CA15873 - Empty Homes Major and Structural Works
Repair & maintenance· Published 16 May
CLOSED
21 May
—
Estimated
Closed
CF
D
DEFRA
Geospatial Enabling Programme Delivery Partner
IT services· Published 16 May
CLOSED
11 Jun
£150k
Estimated
Closed
CF
TN
THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
National Trust NI - Divis - Peatland Restoration
Construction work· Published 16 May
CLOSED
23 Jun
£168k
Estimated
Closed
CF
GM
Greater Manchester Combined Authority - GMP
GMCA 1508 - Race Equality Panel Facilitation
Health & social· Published 16 May
CLOSED
09 Jun
£50k
Estimated
Closed
CF
CC
Clifftown Conservation Society
GB-Southend on sea: Wall Restoration
Construction work· Published 16 May
CLOSED
15 Jul
—
Estimated
Closed
CF
UR
UK Research & Innovation
UKRI-4496 - Synchrotron Arbitrary Waveform Generators
Electrical machinery· Published 16 May
CLOSED
09 Jun
£500k
Estimated
Closed
CF
CC
Clifftown Conservation Society
GB-Southend on sea: Railings Fabrication and Installation
Construction work· Published 16 May
CLOSED
16 May
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
IRM25/7704 The Repair & Calibration of Mass & Mass (On Site Calibration) Items
Repair & maintenance· Published 16 May
CLOSED
13 Jun
—
Estimated
Closed
CF
CA
Cambridgeshire and Peterborough Combined Authority
Bus RTPI Soft Market Testing Exercise - RFI
Software packages· Published 16 May
CLOSED
09 Jun
£50k
Estimated
Closed
CF
CC
Clifftown Conservation Society
GB-Alexandra Bowling Green, Southend on sea, Essex SS: Test Wall Restoration
Construction work· Published 16 May
CLOSED
31 Mar
£20k
Estimated
Closed
CF
NE
NHS England
Independent Review CareTrack System 2025/26
Software packages· Published 16 May
CLOSED
30 May
£600k
Estimated
Closed
CF
PU
Parliament UK
Education and Members Tours Booking System RFI
IT services· Published 16 May
CLOSED
16 Jun
—
Estimated
Closed
CF
MP
Midlands Partnership Foundation Trust
RRE-01265 Discharge to Assess Community Beds
Health & social· Published 16 May
CLOSED
25 May
—
Estimated
Closed
CF
VD
VIVO DEFENCE SERVICES LIMITED
Wiltshire External Refurbishment
Construction work· Published 16 May
CLOSED
22 May
£3.0m
Estimated
Closed
CF
VD
VIVO DEFENCE SERVICES LIMITED
West Moors External Insulation
Construction work· Published 16 May
CLOSED
30 May
£5.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Accommodation Campus - Amenity Building Roofing
Construction work· Published 16 May
CLOSED
28 May
£40.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Fuel Supply and Fuel Facility
Petroleum & fuel· Published 16 May
CLOSED
30 May
£2.5m
Estimated
Closed
CF
SC
Sizewell C Limited
Accommodation Campus - Amenity Building Facade/Glazing
Construction work· Published 16 May
CLOSED
30 May
£10.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Accommodation Campus - Accommodation Buildings Foundations
Construction work· Published 16 May
Page 213 of 8261
PreviousNext