PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
252
New notices
Posted · 30d
10,264
All notice types
Awarded · 7d
1,257
Market signal

Notice peek

×
BG
ClosedCF · 3fc263e309cb

Asset wide BMS Upgrade in Diplomatic Mission

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
22 Apr 2025

Key facts

Notice ID
cf-1ed82c07-c877-48cf-855c-3fc263e309cb
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    22 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 222 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
21 Mar
—
Estimated
Closed
CF
DF
Department for Business & Trade
CR_4932- SPIRE Exit- Export Licensing IT System
Software packages· Published 01 May
CLOSED
31 Dec
£1k
Estimated
Closed
CF
M
MHCLG
*** TEST Notice ***
Business services· Published 01 May
CLOSED
06 Jun
£500k
Estimated
Closed
CF
SH
Surrey Heath Borough Council
GB-Camberley: Camberley Theatre Flat Roof Covering
Construction work· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
Outsourced Dermatology Services 25/26
Health & social· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
SW
Scottish Water
DUPLICATE ERROR - The Provision of Recruitment Agency Services
· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
SW
Scottish Water
DUPLICATE ERROR - The Provision of Recruitment Agency Services
· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
NHS2332 - Outsourced Ophthalmology Services - Macular Services
Health & social· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
SW
Scottish Water
DUPLICATE ERROR - The Provision of Recruitment Agency Services
· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
SW
Scottish Water
DUPLICATE ERROR - The Provision of Recruitment Agency Services
· Published 01 May
CLOSED
02 Jun
—
Estimated
Closed
CF
LC
Leicester College
CA15773 - Toilet Refurbishment, Abbey Park Campus, Leicester
Construction work· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Services
EH
Eildon Housing Association
Provision of HR, Payroll, Recruitment, Staff Rota, Performance & Attendance Management Software with Self-service, Reporting and Analytics
Software packages· Published 01 May
CLOSED
01 May
—
Estimated
Closed
FTS · Works
SH
Sanctuary Housing Association
Main Contractor at Prospecthill Road, Glasgow.
Construction work· Published 01 May
CLOSED
01 Mar
—
Estimated
Closed
CF
WC
Westminster Council City
BT284 - Lilestone Street & Brunel Family Centre
Financial services· Published 01 May
CLOSED
02 Jun
£3.2m
Estimated
Closed
CF
TM
TAMESIDE METROPOLITAN BOROUGH COUNCIL
FLEXIBLE PURCHASING SYSTEM (FPS) FOR THE PROVISION OF THE DEPRIVATION OF LIBERTY SAFEGUARD (DOLS) ASSESSMENTS
Other services· Published 01 May
CLOSED
02 Jun
—
Estimated
Closed
CF
LB
Leeds Beckett University
746SB Electrical Building Services Framework
Architecture & engineering· Published 01 May
CLOSED
02 Jun
£150k
Estimated
Closed
CF
EC
Ealing Council
Contract for Supplying, Installation, Maintaining & Repairing Fencing
Construction work· Published 01 May
CLOSED
09 May
£15k
Estimated
Closed
CF
NY
North York Moors National Park Authority
Linking Levisham Implementation Plan
Sewage & refuse· Published 30 Apr
CLOSED
14 May
—
Estimated
Closed
CF
BC
BIRMINGHAM CHILDREN'S TRUST COMMUNITY INTEREST COMPANY
Domestic Abuse Support
Health & social· Published 30 Apr
CLOSED
28 May
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Proposed Over roofing (and PV enabling) of 140 Cambridge Science Park
Construction work· Published 30 Apr
CLOSED
09 May
£1.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - CCTV Installation and Maintenance
Security & defence· Published 30 Apr
Page 222 of 8261
PreviousNext