PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
257
New notices
Posted · 30d
10,336
All notice types
Awarded · 7d
1,267
Market signal

Notice peek

×
BG
ClosedCF · 3fc263e309cb

Asset wide BMS Upgrade in Diplomatic Mission

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
22 Apr 2025

Key facts

Notice ID
cf-1ed82c07-c877-48cf-855c-3fc263e309cb
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    22 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 227 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
22 Apr
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
NHS2362 - Cornwall facial surgery 25/26
Health & social· Published 22 Apr
CLOSED
22 Apr
£113k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Refurbishment Programme - FY2025/26 - Amey Central and/or North Regions
Construction work· Published 22 Apr
CLOSED
22 Apr
—
Estimated
Closed
FTS · Services
EC
Essex County Council
Children’s Residential Personalised Block Contracts - Phase 2
Health & social· Published 22 Apr
CLOSED
22 Apr
—
Estimated
Closed
CF
NN
North Northamptonshire Council
North Northamptonshire Council - Framework for the Provision of Nicotine Replacement Therapy (NRT)
Health & social· Published 22 Apr
CLOSED
05 May
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
PE0602 Mechanical and Electrical Building Services Repairs, Maintenance and Compliance Programme
Repair & maintenance· Published 22 Apr
CLOSED
16 May
—
Estimated
Closed
CF
HO
Home Office
Automation of the Future - UK Border Trials
Administration services· Published 22 Apr
CLOSED
25 Apr
—
Estimated
Closed
CF
SL
Student Loans Company
MongoDB
Software packages· Published 22 Apr
CLOSED
21 May
—
Estimated
Closed
CF
SC
Sheffield City Council
Highways Sponsorship Signage
Transport equipment· Published 22 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - Cross Talk Attenuators
Industrial machinery· Published 21 Apr
CLOSED
01 May
£50k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - Control Valves
Industrial machinery· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - PICV Valves
Industrial machinery· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - Buffer and Expansion Vessels
Industrial machinery· Published 21 Apr
CLOSED
01 May
£50k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - Heat Flow Meters
Industrial machinery· Published 21 Apr
CLOSED
01 May
£15k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Mechanical Packages - Mechanical Ventilation with Heat Recovery
Industrial machinery· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Logistics Package - Plant Movement Partner
Transport equipment· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Public Health Packages - Electric Water Heaters
Furniture & furnishings· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Public Health Packages - Water Meters
Laboratory equipment· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Public Health Packages - Water Heaters and Hot Water Cylinders
Industrial machinery· Published 21 Apr
CLOSED
01 May
£100k
Estimated
Closed
CF
AJ
Anthro JV
HS2 - Old Oak Common - Public Health Packages - Leak Detection Systems
Industrial machinery· Published 21 Apr
CLOSED
21 Apr
—
Estimated
Closed
FTS · Supplies
FC
Fife Council
CFM0331 - Supply of Sandwiches and Food to Go 2025
Food & beverages· Published 21 Apr
Page 227 of 8261
PreviousNext