PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Deadline
  • Any
  • Closing in 24 hours
  • Closing this week
  • Closing this month
  • Closing in 90 days
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
157
New notices
Posted · 30d
6,334
All notice types
Awarded · 7d
810
Market signal

Notice peek

×
MO
ClosedCF · e0f780122190

WC1167436 - Construction of 3No. New masts to replace existing masts on TCI antenna in SLS, Akrotiri

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
10 Jan 2025

Key facts

Notice ID
cf-970fbe1c-696c-44ce-9fc4-e0f780122190
CPV code
44212250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Jan 2025

Description

The scope of works involves replacing the existing TCI masts with new ones, including the replacement of guy wire anchors and associated rigging accessories, as well as the installation of bird flight deflectors. The foundations for both the masts and the guy wires have already been completed as part of a separate project. The successful contractor will be required to install the towers and guy wires in accordance with the provided drawings and specifications. The TCI antenna system comprises of three guyed steel masts (MT0079, MT0080, and MT0081) located at the Salt Lake Site (West Site) in the RAF Akrotiri area, Cyprus. These masts were originally constructed circa 1997. The Salt Lake Site is a wetland in close proximity to the seafront of Akrotiri Bay, covering an area of approximately 10.65 km². It is divided into the West, Lizard, and Sandra Sites. The TCI antenna system, including the three masts in question, is located at the West Site of the Salt Lake. Table 1: List of masts included in the project S/N Location Asset No. Asset Description Asset Height (m) 1 Akrotiri MT0079 TCI - Steel lattice mast 45.7 2 Akrotiri MT0080 TCI - Steel lattice mast 45.7 3 Akrotiri MT0081 TCI - Steel lattice mast 11.0 The two taller masts are guyed steel lattice structures, each standing 45 meters high. The width and height of the lattice sections are 61cm. Each tower's three legs are composed of circular hollow sections (CHS) with a diameter of 57.2mm and a wall thickness of 2.66mm. The horizontal and diagonal bracings are also made of CHS members, measuring 25.4 mm in diameter with a wall thickness of 1.52mm. The bracing tubes have flattened ends with bolt holes for connection to the vertical CHS legs. The third mast is a guyed steel lattice structure standing 11 meters high. The width and height of the lattice sections are 49 cm. The tower's three legs are composed of CHS with a diameter of 38.1mm and a wall thickness of 1.90mm. The horizontal and diagonal bracings are also made of CHS members, measuring 19.05mm in diameter with a wall thickness of 1.52mm. The bracing tubes also have flattened ends with bolt holes for connection to the vertical CHS legs. The existing masts need to be demolished and reconstructed in accordance with the new design drawings and specifications. Please note that the project must be completed within a fixed period of approximately 4 weeks. This timeframe is non-negotiable, and no work will be allowed outside of the specified period. The contractor must allocate adequate resources to ensure the project is completed within this timeframe. The Provisional Key Tender dates for the project are as follows: · Issue of Tender Documents: Monday 27th January 2025. · Tender return date: Friday 28th February 2025. · Contract award date: Friday 04th April 2025. · Commencement of work onsite: Monday 01st September 2025. · Completion of Work: Friday 26th September 2025. The currency of this project is Euro (€)

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
496 noticesopen · sorted by deadline ascending
Page 23 of 25
Time to close
Value
Type
Buyer
Notice
Closing this week20 notices
6d
10 Jul
£350k
Estimated
Tender
FTS · Works
BB
Burnley Borough Council
Concrete Defect Repairs - Charter Walk Shopping Centre, Burnley, BB11 1PY
Construction work· Published 25 Jun
6d
10 Jul
£350k
Estimated
Tender
FTS · Works
BB
Burnley Borough Council
Concrete Defect Repairs - Charter Walk Shopping Centre, Burnley, BB11 1PY
Construction work· Published 26 Jun
6d
10 Jul
£45.0m
Estimated
Tender
FTS · Supplies
BH
BELFAST HEALTH AND SOCIAL CARE TRUST
Orthopaedics – Hip and Knee Replacement Products
Medical equipment· Published 11 Jun
6d
10 Jul
£350k
Estimated
Tender
FTS · Works
BB
Burnley Borough Council
Concrete Defect Repairs - Charter Walk Shopping Centre, Burnley, BB11 1PY
Construction work· Published 15 Jun
6d
10 Jul
£45.0m
Estimated
Tender
FTS · Supplies
SH
Southern Health and Social Care Trust
Orthopaedics – Hip and Knee Replacement Products
Medical equipment· Published 15 Jun
6d
10 Jul
—
Estimated
Tender
CF
KM
KBS Maritime Ltd
Rotary Frequency Converter
Electrical machinery· Published 08 Jun
6d
10 Jul
£500k
Estimated
Tender
FTS · Works
WP
Wivelsfield Parish Council
Wivelsfield Recreational Sports and Play Project
Musical instruments· Published 08 May
6d
10 Jul
—
Estimated
Tender
FTS · Services
AB
ASSOCIATED BRITISH PORTS
UKD Orca Dry Dock Requirement 2026
Transport equipment· Published 12 Jun
7d
10 Jul
£14k
Estimated
Below-thresh.
FTS · Works
NE
Natural England
Moor House Upper Teesdale NNR - Widdybank and Garrigill track works.
Construction work· Published 22 Jun
7d
10 Jul
£12k
Estimated
Below-thresh.
FTS · Services
NE
Natural England
High Level Conservation Measures for the River Avon (Nutrient-Affected Features)
Sewage & refuse· Published 19 Jun
7d
10 Jul
—
Estimated
Tender
CF
LT
Looe Town Council
Guildhall Public Conveniences - plumbing and sanitary ware refurbishment
Repair & maintenance· Published 12 Jun
7d
10 Jul
£70k
Estimated
Below-thresh.
FTS · Works
SM
Sandwell Metropolitan Borough Council
GS191 - Oak House Museum Play Project
Construction work· Published 18 Jun
7d
10 Jul
£50k
Estimated
Below-thresh.
CF
LT
Looe Town Council
Looe Seafront Toilets roof refurbishment
Construction work· Published 01 Jun
7d
10 Jul
£485k
Estimated
Tender
FTS · Services
HE
Homes England (the name adopted by the Homes and Communities Agency)
Homes England - Northern Arc, Burgess Hill Landscape Maintenance and Cleansing Contract 2025 - 2028
Agriculture & forestry· Published 15 Jun
7d
10 Jul
—
Estimated
Tender
FTS · Works
MH
Magna Housing Limited
MGN0095 - Scaffolding Tender
Construction work· Published 10 Jun
7d
10 Jul
£50k
Estimated
Below-thresh.
FTS · Services
CO
Council of the Isles of Scilly
Greenwaste 2026
Sewage & refuse· Published 18 Jun
7d
10 Jul
£14k
Estimated
Below-thresh.
FTS · Works
NE
Natural England
Moor House Upper Teesdale NNR - Silverband Track Refurbishment
Construction work· Published 22 Jun
7d
10 Jul
£100k
Estimated
Tender
FTS · Works
SO
South Oxfordshire District Council
Replacement of sports hall floor including remedial action/new damp proof membrane applied to flooring substrate at Abbey Sports Centre, Green Furlong, Berinsfield, Wallingford
Construction work· Published 04 Jun
7d
10 Jul
£70k
Estimated
Below-thresh.
FTS · Services
VO
Vale of White Horse District Council
Heat network techno-economic feasibility study for Didcot
Architecture & engineering· Published 05 Jun
7d
10 Jul
£14k
Estimated
Below-thresh.
FTS · Works
NE
Natural England
Moor House Upper Teesdale NNR - Silverband Track Refurbishment
Construction work· Published 22 Jun
Page 23 of 25
PreviousNext