PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
141
Open notices
Closing this week
457
Don’t miss
Open · all
2,982
Live opportunities
Posted · 24h
521
New notices
Posted · 30d
12,942
All notice types
Awarded · 7d
2,045
Market signal

Notice peek

×
CO
ClosedCF · b9480bced91c

Millennium Bridge Refurbishment

City of London Corporation
Status
Closed
Estimated
£3.5m
Published
05 Dec 2024

Key facts

Notice ID
cf-af75c1bb-0898-4f2b-a291-b9480bced91c
CPV code
44212120 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    05 Dec 2024

Description

The City Bridge Foundation is looking for a contractor to undertake the refurbishment of London's iconic Millennium Bridge. The project will include three key elements; 1. The resurfacing of the existing aluminium deck to improve slip resistance. The original aluminium deck is still in use. However, owing to high footfall over the bridge, the slip resistance of top surface of the deck has reduced and in some places the texture has completely worn away. The project will introduce a new surface coating to each deck plank to improve this slip resistance. 2. Repainting of the steelwork. The bridge was last touched up in 2016 and the paint system in in generally good condition. The project will repaint all areas of steel (including some not previously painted). 3. Re-tensioning of the suspension cables. This has not been completed before and will restore the profile of the central span following the initial relaxation of the cables and abutments. As a key river crossing it is important that disruption to the users of the bridge is minimised throughout the work. Contractors are encouraged to explore alternative solutions and approaches to maximise the time that the bridge can remain in operation during the project. Details of alternative solutions should be included separately as part of your submission. The Millennium Bridge is a 325m long steel suspension footbridge, with a main span of 144m, spanning over the River Thames linking the City of London at St. Paul's Cathedral with the Tate Modern Gallery at Bankside. First opened in June 2000, the bridge was closed almost immediately due to the excessive swaying movement of the structure caused by synchronised walking action from large groups of pedestrians. After investigations, the bridge was re-opened to the public in February 2002 with significant modifications added such as tuned mass dampers, to reduce both vertical and horizontal vibrations, and viscous dampers to resist the sway movements of the bridge. The bridge is supported on very shallow suspension cables on each side of the bridge made of 4 locked coil strands, each of 120mm diameter. The cable has a span to dip ratio of 63:1. The cables are anchored at each abutment and pass over two river piers. The cables support a deck formed from steel longitudinal beams which are supported on transverse arms which clamp on to the cable at each side at 8m intervals. The steel deck supports aluminium decking panels which span transversely 3.6m over the majority of the length of the bridge until the deck bifurcates at the southern abutment. There are movement joints in the deck at 16m centres. About City Bridge Foundation City Bridge Foundation is a world class bridge owner and London's biggest independent charity funder. Our charity, City Bridge Foundation, was set up around 900 years ago for the maintenance of the old London Bridge. Our primary aim remains to maintain our five bridges - Tower, London,

You might also see

  • All City of London Corporation notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 25 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
08 Apr
—
Estimated
Closed
FTS · Supplies
HA
Highlands and Islands Airports Limited
Provision of Hold Baggage X-ray Equipment at Six Airports
Security & defence· Published 08 Apr
CLOSED
07 Apr
—
Estimated
Closed
FTS · Works
PA
Police and Crime Commissioner for South Wales
Contract for the Provision of Alteration and Improvement works – House 1&2 and 3&4, South Wales Police Headquarters, Bridgend
Construction work· Published 07 Apr
CLOSED
07 Apr
—
Estimated
Closed
FTS · Works
PA
Police and Crime Commissioner for South Wales
Contract for the Provision of Alteration and Improvement works – House 1&2 and 3&4, South Wales Police Headquarters, Bridgend
Construction work· Published 07 Apr
CLOSED
07 Apr
—
Estimated
Modification
FTS
DC
Durham County Council
003191 - Contract for Provision of accommodation and support for homeless individuals with multiple vulnerabilities
· Published 07 Apr
CLOSED
22 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
PFRU2-2025-440
Office & computing· Published 07 Apr
CLOSED
07 Apr
—
Estimated
Modification
FTS
NN
NHS NORTH OF ENGLAND COMMISSIONING SUPPORT UNIT
Courier Services for the North of England Commission Support (NECS)
· Published 07 Apr
CLOSED
20 Apr
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
A66 - Demolition
Construction work· Published 07 Apr
CLOSED
07 Apr
—
Estimated
Closed
FTS · Services
NW
NHS West Yorkshire Integrated Care Board
Adult Disordered Eating Service - NHS West Yorkshire Integrated Care Board (Wakefield District Health and Care Partnership)
· Published 07 Apr
CLOSED
15 Apr
£1
Estimated
Closed
CF
MP
Metropolitan Police Service
CCS Cyber Security Services 3 (DPS) Stage 1 Capability Assessment
IT services· Published 07 Apr
CLOSED
04 Feb
—
Estimated
Closed
CF
ST
South Tyneside Council
Housing Services Vehicles
Transport equipment· Published 07 Apr
CLOSED
21 Apr
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Digital Printer(s) & Booklet Maker Hire - Navy Graphics Capability Update
Office & computing· Published 07 Apr
CLOSED
22 Oct
—
Estimated
Closed
CF
SC
Shropshire Council
PMCV 013 - Community Drug and Alcohol Treatment and Recovery Service
Health & social· Published 03 Apr
CLOSED
03 Apr
—
Estimated
Closed
FTS · Supplies
SG
Scottish Government
Profiling conductivity, temperature, depth instrument for use on board MRV Scotia
· Published 03 Apr
CLOSED
02 Apr
—
Estimated
Modification
FTS
RN
Royal National Orthopaedic Hospital NHS Trust
UCLH-7264 - Non-Emergency Patient Transport Services
· Published 02 Apr
CLOSED
15 Apr
—
Estimated
Closed
CF
BC
Bury College
CA17519 - Bury College - Wi-Fi 7
IT services· Published 02 Apr
CLOSED
05 Mar
£3.8m
Estimated
Closed
CF
DF
Department for Work & Pensions
Bank Validation and Verification Service (2026-2029)
Software packages· Published 02 Apr
CLOSED
02 Apr
—
Estimated
Modification
FTS
TW
Tunbridge Wells Borough Council
TMBC - Poult Wood Golf Club - Air Source Heat Pumps
· Published 02 Apr
CLOSED
02 Apr
—
Estimated
Modification
FTS
TP
The Police and Crime Commissioner for Northumbria
Applicant Tracking System
· Published 02 Apr
CLOSED
17 Apr
£40k
Estimated
Closed
CF
LB
London Borough of Haringey
Feasibility Study - CCTV & Connected Care Re-location
Architecture & engineering· Published 02 Apr
CLOSED
27 Apr
£500k
Estimated
Closed
CF
TU
Teesside University
GB-Middlesbrough: Cisco DNA Equipment - Supply Only
Installation services· Published 02 Apr
Page 25 of 8764
PreviousNext