PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
157
New notices
Posted · 30d
7,549
All notice types
Awarded · 7d
952
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 273 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
25 Mar
£3.0m
Estimated
Closed
CF
LH
LIVEWEST HOMES LIMITED
Drainage and Associated Works for LiveWest
Construction work· Published 21 Feb
CLOSED
07 Apr
£75k
Estimated
Closed
CF
GM
Greater Manchester Combined Authority - GMP
Racial Inequalities effect on housing and homelessness research
Business services· Published 21 Feb
CLOSED
28 Apr
£4.0m
Estimated
Closed
CF
LC
Liverpool City Region Combined Authority
Mersey Tidal Power Project - Front-End Engineering Design Services (FEED Services) - Phase 4
Architecture & engineering· Published 21 Feb
CLOSED
02 Apr
—
Estimated
Closed
CF
CC
Colchester City Council
Corporate Office Building Cleaning and Sheltered Housing Building Cleaning for Colchester City Council, Colchester Borough Homes, Braintree District Council and Tendring District Council
Sewage & refuse· Published 21 Feb
CLOSED
24 Mar
—
Estimated
Closed
CF
S
Sourcedogg
Future of Food
Business services· Published 21 Feb
CLOSED
12 Mar
—
Estimated
Closed
CF
BC
BRITISH COUNCIL(THE)
DPS Computer Based Exams IELTS, ACCA Venue in Indonesia, Malaysia, Thailand
Education & training· Published 21 Feb
CLOSED
28 Mar
—
Estimated
Closed
CF
WB
Warrington Borough Council
Dynamic Purchasing System for Specialist Transport Services (2025)
Transport services· Published 21 Feb
CLOSED
12 Mar
£70k
Estimated
Closed
CF
LC
Leicestershire Constabulary
PAT Testing & ECIR
Architecture & engineering· Published 21 Feb
CLOSED
22 Apr
£1.3m
Estimated
Closed
CF
LB
London Borough of Lewisham
School Minor Works Programme 2025 - Professional Services and Condition Survey
Architecture & engineering· Published 21 Feb
CLOSED
25 Mar
—
Estimated
Closed
CF
FC
First Choice Homes Oldham
Retrofit Coordination Services
Architecture & engineering· Published 21 Feb
CLOSED
21 Mar
£150k
Estimated
Closed
CF
CE
CHESHIRE EAST COUNCIL
Supply of Safety Surfacing for Play Areas
Construction work· Published 21 Feb
CLOSED
31 Mar
—
Estimated
Closed
CF
UH
University Hospitals Birmingham NHS Foundation Trust
UHB WMSDE Digital Histology Annotation - PME
IT services· Published 21 Feb
CLOSED
31 Mar
£85k
Estimated
Closed
CF
WB
Warrington Borough Council
Pool Toys & Accessories
Clothing & footwear· Published 21 Feb
CLOSED
05 Mar
£141k
Estimated
Closed
CF
EO
East of England Ambulance Service
EEAST - Recovering of Roof & Associated Works at Saxmundham Amb Station (250219)
Construction work· Published 21 Feb
CLOSED
28 Mar
£200.0m
Estimated
Closed
CF
HA
HEART ACADEMIES TRUST
Framework for the Provision of Food and Outsourced Catering Services
Hotel & restaurant· Published 21 Feb
CLOSED
23 Mar
—
Estimated
Closed
CF
TF
Thames Freeport Limited
Strategic Delivery Skills
Business services· Published 21 Feb
CLOSED
14 Mar
£300k
Estimated
Closed
CF
EA
Environment Agency
ALDT and the Land Drainage Act 1991
Sewage & refuse· Published 21 Feb
CLOSED
03 Apr
—
Estimated
Closed
CF
CQ
Care Quality Commission
Experts by Experience
Health & social· Published 21 Feb
CLOSED
28 Feb
—
Estimated
Closed
CF
SH
Shropshire Healthcare Procurement Service
RA349059 - Simulated Patient Monitor
Medical equipment· Published 21 Feb
CLOSED
24 Mar
£180k
Estimated
Closed
CF
UU
Ukaea United Kingdom Atomic Energy Authority
Machining Framework
Industrial machinery· Published 21 Feb
Page 273 of 8261
PreviousNext