PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
174
New notices
Posted · 30d
7,139
All notice types
Awarded · 7d
912
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 295 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
28 Mar
—
Estimated
Closed
CF
UR
UK Research & Innovation
UKRI-4347 Compressed Air, Nitrogen Generators, Carbon Towers and Associated Services
Repair & maintenance· Published 20 Feb
CLOSED
07 Apr
£1.0m
Estimated
Closed
CF
HA
Herefordshire and Worcestershire Health and Care NHS Trust
Occupational Health Services
Health & social· Published 20 Feb
CLOSED
20 Feb
—
Estimated
Closed
FTS · Services
SS
South Staffordshire College
HR - TEMPORARY STAFFING (ACADEMIC & SUPPORT)
Business services· Published 20 Feb
CLOSED
24 Mar
£14.0m
Estimated
Closed
CF
DC
Derbyshire County Council
PLACE622H- Supply of Traffic Management
Transport equipment· Published 20 Feb
CLOSED
28 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
713433450 - Supply of LPG to MoD Sites in Italy
Petroleum & fuel· Published 20 Feb
CLOSED
03 Mar
£400k
Estimated
Closed
CF
CW
Cheshire West and Chester Council
Occupational Health Service - SOFT MARKET TESTING (FEB25)
Health & social· Published 20 Feb
CLOSED
04 Apr
—
Estimated
Closed
CF
PS
Procurement Services - Lifecycle on behalf of COMMERCIAL SERVICES KENT LIMITED
Supply of Asbestos Inspection and Removal Y23061
Sewage & refuse· Published 20 Feb
CLOSED
19 Mar
—
Estimated
Closed
CF
HE
HealthTrust Europe LLP (HTE)
Framework Agreement for the Supply of Environmental Monitoring Solutions
Sewage & refuse· Published 20 Feb
CLOSED
04 Apr
£1.0bn
Estimated
Closed
CF
CP
CRESCENT PURCHASING LIMITED
CA15344 - Utilities Dynamic Purchasing System (DPS)
Petroleum & fuel· Published 20 Feb
CLOSED
24 Mar
—
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Waltham Forest Newspaper and Leaflets Distribution
Postal & telecomms· Published 20 Feb
CLOSED
13 Mar
—
Estimated
Closed
CF
TT
Transpennine Trains Limited
Light Maintenance Services at Scarborough Depot
Repair & maintenance· Published 20 Feb
CLOSED
26 Mar
—
Estimated
Closed
CF
TH
Tower Hamlets
CO5998 Victoria Park Winter Events Programme
Recreational & cultural· Published 20 Feb
CLOSED
24 Mar
—
Estimated
Closed
CF
FH
Flagship Housing Group
Domestic Appliances for Hopestead
Furniture & furnishings· Published 20 Feb
CLOSED
20 Mar
£20k
Estimated
Closed
CF
NB
NHS Business Services Authority
C338953 Renewal of Vulnerability Management
Software packages· Published 20 Feb
CLOSED
20 May
—
Estimated
Closed
CF
MG
MSE Group
CA15364 - Capability Assessment for Insourced Radiographers - SBS10203
Health & social· Published 20 Feb
CLOSED
20 May
—
Estimated
Closed
CF
LB
London Borough of Bromley
Follow up Market Engagement Event - Care & Support Services for Extra Care Housing in Bromley
Health & social· Published 20 Feb
CLOSED
24 Mar
£75k
Estimated
Closed
CF
NA
Norfolk and Norwich University Hospitals NHS Foundation Trust
NNUH Debt Recovery Project
Business services· Published 20 Feb
CLOSED
02 May
—
Estimated
Closed
CF
SB
Slough Borough Council
Local Electric Vehicle Infrastructure (LEVI) Network for Slough Borough Council.
Supporting transport· Published 20 Feb
CLOSED
14 Mar
£185k
Estimated
Closed
CF
MK
Milton Keynes Council
NHS Health Checks Software
Health & social· Published 20 Feb
CLOSED
14 Mar
—
Estimated
Closed
CF
BC
Birmingham City Council
PQ0540 - Crematorium & Cemetery supplies
Other services· Published 20 Feb
Page 295 of 8261
PreviousNext