PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
183
New notices
Posted · 30d
6,836
All notice types
Awarded · 7d
880
Market signal

Notice peek

×
KI
ClosedCF · 3842899c4140

Brewery Turnback - ES6-8 E & P Works

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£100k
Published
07 Oct 2025

Key facts

Notice ID
cf-3125f6b4-21da-41fc-a4ed-3842899c4140
CPV code
31224400 · Electrical machinery
Source
Contracts Finder

Timeline

  1. Published
    07 Oct 2025

Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. E&P Scope of Work: The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Electrical machinery notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 303 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
21 Mar
—
Estimated
Closed
CF
NH
Notting Hill Genesis
Consultancy Services Dynamic Purchasing System
Architecture & engineering· Published 19 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
NH
Notting Hill Genesis
Planned Upgrade/Improvement Works Dynamic Purchasing System
Construction work· Published 19 Feb
CLOSED
28 Mar
£18.0m
Estimated
Closed
CF
DM
Dudley Metropolitan Borough Council
DUD - Tender for Major Adaptations and Housing Assistance Works within the Borough of Dudley 2025-29
Construction work· Published 19 Feb
CLOSED
08 Apr
£250k
Estimated
Closed
CF
ES
EU SUPPLY LIMITED
Fixed Crane Maintenance Service
Construction work· Published 19 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
KC
Kent County Council
SC240052 - Print Services Framework
Printed matter· Published 19 Feb
CLOSED
28 Feb
£11k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA15357 - RFQ 2024/35 - Roadside Amenity Landscape Works, Abbey Way Newry
Construction work· Published 19 Feb
CLOSED
07 Mar
£160k
Estimated
Closed
CF
TH
Thirteen Housing Group Limited
Audio Visual Partner
Business services· Published 19 Feb
CLOSED
21 Mar
£66k
Estimated
Closed
CF
ES
EU SUPPLY LIMITED
Extension and Adaptation Works for Hyde Park Property
Construction work· Published 19 Feb
CLOSED
28 Mar
—
Estimated
Closed
CF
NY
North Yorkshire County Council
Request for Information for Scarborough North Bay
Construction work· Published 19 Feb
CLOSED
12 Mar
£80k
Estimated
Closed
CF
NE
NHS England
East of England Health & Justice neurodiversity HNA
Health & social· Published 19 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
LC
Luton Council
AT1354 - Associate Educational Psychologists to provide Statutory Assessments
Education & training· Published 19 Feb
CLOSED
25 Mar
£1.2m
Estimated
Closed
CF
AH
Alliance Homes
Drainage Works (657-AHL)
Repair & maintenance· Published 19 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
ES
East Staffordshire Borough Council
Burton High Street Regeneration Design & Build Project
Architecture & engineering· Published 19 Feb
CLOSED
19 Mar
£250k
Estimated
Closed
CF
NE
North East Ambulance Service
Occupational Health Consultant 2025 providing 7.5hrs per week
Health & social· Published 19 Feb
CLOSED
26 Mar
£50k
Estimated
Closed
CF
TB
Tewkesbury Borough Council
Rebuild and secure footpath at Horsbere Brook, Brockworth.
Construction work· Published 19 Feb
CLOSED
26 Feb
—
Estimated
Closed
CF
GT
GALLIFORD TRY INFRASTRUCTURE LIMITED
A47 Tuddenham to Easton - TASCAR
Construction materials· Published 19 Feb
CLOSED
07 Apr
—
Estimated
Closed
CF
BC
BRITISH COUNCIL(THE)
2025 DPS EU IELTS PTP South East Cluster
Education & training· Published 19 Feb
CLOSED
14 Mar
—
Estimated
Closed
CF
NN
North Northamptonshire Council
North Northamptonshire Council - Substance Misuse Service Model Soft Market Testing Excercise
Health & social· Published 19 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
GP
Great Places Housing Group Limited
PPE/Workwear
Clothing & footwear· Published 19 Feb
CLOSED
17 Mar
£24k
Estimated
Closed
CF
KP
Kingsthorpe Parish Council
Floral Displays - Barrier Baskets and Window Boxes
Agriculture & forestry· Published 19 Feb
Page 303 of 8261
PreviousNext