PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
91
New notices
Posted · 30d
6,687
All notice types
Awarded · 7d
822
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 317 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
24 Mar
—
Estimated
Closed
CF
SG
Scape Group Limited (trading as SCAPE)
AP2340 - Temporary Staff Framework
Business services· Published 17 Feb
CLOSED
07 Apr
£2.0bn
Estimated
Closed
CF
NE
NHS England
NHS Framework Agreement for Branded Medicines - Tranche B - NOFE & MAE and Eculizumab & Ravulizumab for London & SOFE - 01 September 2025
Medical equipment· Published 17 Feb
CLOSED
03 Mar
—
Estimated
Closed
CF
LJ
Liverpool John Moores University
An independent assessment and refresh of the economic contribution of the Maritime Sector in the Liverpool City Region
Business services· Published 17 Feb
CLOSED
05 Mar
£40k
Estimated
Closed
CF
TW
The West of England Combined Authority
B&NES Heat Network Feasibility Study
Architecture & engineering· Published 17 Feb
CLOSED
12 Mar
£120k
Estimated
Closed
CF
B
BFI
Screen Business 2025-2026 Edition
R&D services· Published 17 Feb
CLOSED
13 Mar
£150k
Estimated
Closed
CF
MF
Merseyside Fire and Rescue Service
Supply of Scrap Cars
Industrial machinery· Published 17 Feb
CLOSED
18 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Next Generation Surface Electronic Warfare Threat - RFI
Education & training· Published 17 Feb
CLOSED
28 Feb
£250k
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Structural Steel Stairs
Construction work· Published 17 Feb
CLOSED
28 Feb
£20.0m
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Signalling and Telecoms
Construction work· Published 17 Feb
CLOSED
28 Feb
£5.0m
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - OLE Works
Construction work· Published 17 Feb
CLOSED
28 Feb
£5.0m
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Permanent Way
Construction work· Published 17 Feb
CLOSED
28 Feb
£5.0m
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Bored Piling (SFA, Rotary Bored)
Construction materials· Published 17 Feb
CLOSED
28 Feb
£100k
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Controlled Demolition
Construction work· Published 17 Feb
CLOSED
28 Feb
£250k
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Fencing
Construction work· Published 17 Feb
CLOSED
28 Feb
£1.0m
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport Platform Remodelling 2nd FBC - Rail Mechanical & Electrical
Architecture & engineering· Published 17 Feb
CLOSED
05 Mar
£475k
Estimated
Closed
CF
MC
Medway Council
Replacement Gas Boilers_Hoo Sports Centre
Construction materials· Published 17 Feb
CLOSED
19 Feb
—
Estimated
Closed
CF
BC
BRITISH COUNCIL(THE)
2025 Study UK Career Development Roadshow
Business services· Published 17 Feb
CLOSED
26 Mar
£160k
Estimated
Closed
CF
CB
Chesterfield Borough Council
Tapton Park Innovation Centre cleaning staff
Sewage & refuse· Published 17 Feb
CLOSED
17 Mar
£550k
Estimated
Closed
CF
D
Dounreay
Procurement of a Waste Assay System
Sewage & refuse· Published 17 Feb
CLOSED
18 Mar
£150k
Estimated
Closed
CF
B
BFI
Email Service Provider
Software packages· Published 17 Feb
Page 317 of 8261
PreviousNext