PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
218
New notices
Posted · 30d
7,232
All notice types
Awarded · 7d
942
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 361 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
03 Feb
—
Estimated
Closed
CF
SE
Sport England
SE1184 Active Environments Framework
IT services· Published 03 Feb
CLOSED
03 Mar
—
Estimated
Closed
CF
LC
Leeds City Council
Flooring Materials
Furniture & furnishings· Published 31 Jan
CLOSED
17 Feb
—
Estimated
Closed
CF
BC
BRITISH COUNCIL(THE)
PIN: UK_331 - Trapped Cash Solution (Global Payment Service Provider (PSP))
Financial services· Published 31 Jan
CLOSED
03 Mar
£2.0m
Estimated
Closed
CF
HE
HealthTrust Europe LLP (HTE) acting on behalf of
RWT Vehicle Hire
Transport services· Published 31 Jan
CLOSED
28 Mar
—
Estimated
Closed
CF
PO
Ports of Jersey
Provision of Marine Fuel Services for Consolidated Sites, St Helier, Jersey, Channel Islands
Petroleum & fuel· Published 31 Jan
CLOSED
11 Mar
—
Estimated
Closed
CF
XC
Xavier Catholic Education Trust
Xavier Catholic Education Trust Catering Tender
Hotel & restaurant· Published 31 Jan
CLOSED
05 Mar
—
Estimated
Closed
CF
UB
UK BIOBANK LIMITED
Laboratory IT Systems
Software packages· Published 31 Jan
CLOSED
21 Feb
—
Estimated
Closed
CF
PC
Phoenix Community Housing
Phoenix Community Housing - Device as a Service
Office & computing· Published 31 Jan
CLOSED
14 Mar
—
Estimated
Closed
CF
OM
OAK Multi Academy Trust
OAK MULTI ACADEMY TRUST - PROVISION OF OUTSOURCED CATERING SERVICE
Hotel & restaurant· Published 31 Jan
CLOSED
03 Mar
—
Estimated
Closed
CF
OH
Orchard Hill College & Academy Trust
Provision of Cleaning services to school and associated buildings
Sewage & refuse· Published 31 Jan
CLOSED
19 Feb
£100k
Estimated
Closed
CF
C
capitalEsourcing
Local Environmental Quality Surveys in line with Defra NI195 Guidance
Architecture & engineering· Published 31 Jan
CLOSED
07 Mar
£6.4m
Estimated
Closed
CF
LH
LIVEWEST HOMES LIMITED
Healy Place Development
Construction work· Published 31 Jan
CLOSED
11 Mar
£345k
Estimated
Closed
CF
C
CHP
Income Analytics Software as a Service
Software packages· Published 31 Jan
CLOSED
28 Mar
£18.4m
Estimated
Closed
CF
SC
Surrey County Council
Sunbury Community Hub
Construction work· Published 31 Jan
CLOSED
14 Feb
£5.0m
Estimated
Closed
CF
FS
FINANCIAL SERVICES COMPENSATION SCHEME LIMITED
GB-London: Office Refurbishment and Fitout Services for new premises
Construction work· Published 31 Jan
CLOSED
17 Mar
—
Estimated
Closed
CF
PO
Post Office Limited
Common Digital Platform
Software packages· Published 31 Jan
CLOSED
28 Feb
£125k
Estimated
Closed
CF
WP
Welland Procurement
HDC 1394 TENDER FOR THE REFURBISHMENT OF THE GOODS/PASSENGER LIFTS AT MARKET HALL
Industrial machinery· Published 31 Jan
CLOSED
31 Mar
—
Estimated
Closed
CF
PO
Post Office Limited
Back-Office applications support and modernisation
Software packages· Published 31 Jan
CLOSED
31 Jan
—
Estimated
Closed
FTS · Works
PB
Prifysgol Bangor / Bangor University
North Wales Medical School - Deiniol Building Fabric and Fit Out Works
Construction work· Published 31 Jan
CLOSED
30 Apr
—
Estimated
Closed
CF
CC
Cambridgeshire County Council
Cambridgeshire County Council - Virtual Reality Headsets for Trauma Awareness training
Education & training· Published 31 Jan
Page 361 of 8261
PreviousNext