PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
79
Open notices
Closing this week
486
Don’t miss
Open · all
2,937
Live opportunities
Posted · 24h
400
New notices
Posted · 30d
12,223
All notice types
Awarded · 7d
1,997
Market signal

Notice peek

×
MO
ClosedCF · e0f780122190

WC1167436 - Construction of 3No. New masts to replace existing masts on TCI antenna in SLS, Akrotiri

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
10 Jan 2025

Key facts

Notice ID
cf-970fbe1c-696c-44ce-9fc4-e0f780122190
CPV code
44212250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Jan 2025

Description

The scope of works involves replacing the existing TCI masts with new ones, including the replacement of guy wire anchors and associated rigging accessories, as well as the installation of bird flight deflectors. The foundations for both the masts and the guy wires have already been completed as part of a separate project. The successful contractor will be required to install the towers and guy wires in accordance with the provided drawings and specifications. The TCI antenna system comprises of three guyed steel masts (MT0079, MT0080, and MT0081) located at the Salt Lake Site (West Site) in the RAF Akrotiri area, Cyprus. These masts were originally constructed circa 1997. The Salt Lake Site is a wetland in close proximity to the seafront of Akrotiri Bay, covering an area of approximately 10.65 km². It is divided into the West, Lizard, and Sandra Sites. The TCI antenna system, including the three masts in question, is located at the West Site of the Salt Lake. Table 1: List of masts included in the project S/N Location Asset No. Asset Description Asset Height (m) 1 Akrotiri MT0079 TCI - Steel lattice mast 45.7 2 Akrotiri MT0080 TCI - Steel lattice mast 45.7 3 Akrotiri MT0081 TCI - Steel lattice mast 11.0 The two taller masts are guyed steel lattice structures, each standing 45 meters high. The width and height of the lattice sections are 61cm. Each tower's three legs are composed of circular hollow sections (CHS) with a diameter of 57.2mm and a wall thickness of 2.66mm. The horizontal and diagonal bracings are also made of CHS members, measuring 25.4 mm in diameter with a wall thickness of 1.52mm. The bracing tubes have flattened ends with bolt holes for connection to the vertical CHS legs. The third mast is a guyed steel lattice structure standing 11 meters high. The width and height of the lattice sections are 49 cm. The tower's three legs are composed of CHS with a diameter of 38.1mm and a wall thickness of 1.90mm. The horizontal and diagonal bracings are also made of CHS members, measuring 19.05mm in diameter with a wall thickness of 1.52mm. The bracing tubes also have flattened ends with bolt holes for connection to the vertical CHS legs. The existing masts need to be demolished and reconstructed in accordance with the new design drawings and specifications. Please note that the project must be completed within a fixed period of approximately 4 weeks. This timeframe is non-negotiable, and no work will be allowed outside of the specified period. The contractor must allocate adequate resources to ensure the project is completed within this timeframe. The Provisional Key Tender dates for the project are as follows: · Issue of Tender Documents: Monday 27th January 2025. · Tender return date: Friday 28th February 2025. · Contract award date: Friday 04th April 2025. · Commencement of work onsite: Monday 01st September 2025. · Completion of Work: Friday 26th September 2025. The currency of this project is Euro (€)

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 372 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
27 Feb
—
Estimated
Closed
CF
NS
NHS SOUTH, CENTRAL AND WEST COMMISSIONING SUPPORT UNIT
Mandatory Dental Services at West Carclaze Dental Practice, St Austell, Cornwall
Health & social· Published 30 Jan
CLOSED
27 Feb
£60k
Estimated
Closed
CF
GL
GREENSQUAREACCORD LIMITED
Landscaping - St Gregory's
Construction work· Published 30 Jan
CLOSED
12 Mar
—
Estimated
Closed
CF
HO
Home Office
NPCC Less Lethal Weapons - distance capability device - Request for Information
Security & defence· Published 30 Jan
CLOSED
12 Feb
—
Estimated
Closed
CF
DF
Department for Education
Market Engagement Event - Tackling Antisemitism in Education Innovation Fund
Education & training· Published 30 Jan
CLOSED
03 Mar
—
Estimated
Closed
CF
FH
Flagship Housing Group
Retrofit Surveyors & Assessors Framework
Architecture & engineering· Published 30 Jan
CLOSED
28 Feb
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Purchase of X-Ray Flourescence (XRF) Spectrometer
Laboratory equipment· Published 30 Jan
CLOSED
14 Feb
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Sexual misconduct and harrassment training
Education & training· Published 30 Jan
CLOSED
13 Feb
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Pre-Marketing Engagement: RBKC: Case Management System; Building Control, Land Charges and Planning
IT services· Published 30 Jan
CLOSED
28 Mar
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
EPP0166 - BDC Leisure Centres Management - Interim provision
Recreational & cultural· Published 30 Jan
CLOSED
07 Mar
£100k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Campbeltown: OPA T742 OFD Campbeltown Tank 6 Inspection
Architecture & engineering· Published 30 Jan
CLOSED
24 Feb
—
Estimated
Closed
CF
BP
BBC - Property
BBC 0125 - Roofing Works at 96 Turners Hill, Cheshunt, Hertfordshire, EN8 8LQ
Construction work· Published 30 Jan
CLOSED
30 Apr
—
Estimated
Closed
CF
WC
Worcestershire County Council
HEA25007 Pre-Market Engagement: Community Based Domestic Abuse Service
Health & social· Published 30 Jan
CLOSED
05 Mar
£500k
Estimated
Closed
CF
TO
The Oil & Pipelines Agency
GB-Campbeltown: OPA T741 OFD Campbeltown Tank 6 Blasting and Lining
Construction work· Published 30 Jan
CLOSED
14 Feb
£179k
Estimated
Closed
CF
CF
CENTRE FOR PROCESS INNOVATION LIMITED
Framework for Innovation and Leadership Development Programmes
Education & training· Published 30 Jan
CLOSED
13 Feb
£68k
Estimated
Closed
CF
GL
GREENSQUAREACCORD LIMITED
Phase 1 and 2 Landscaping - Somerford Place
Construction work· Published 30 Jan
CLOSED
03 Mar
£493k
Estimated
Closed
CF
HU
Hull University Teaching Hospitals NHS Trust
TAXI TRANSPORT SERVICE AND GLOBAL SYSTEM FOR MOBILE COMMUNICATION (GSM) FOR TAXI
Transport services· Published 30 Jan
CLOSED
13 Feb
£55k
Estimated
Closed
CF
EC
ENTERPRISE CHESHIRE AND WARRINGTON
The Delivery of Decarbonisation Training Needs Analysis in support of Regional Skills Mapping
Business services· Published 30 Jan
CLOSED
03 Mar
—
Estimated
Closed
CF
HQ
HEALTHCARE QUALITY IMPROVEMENT PARTNERSHIP
National Clinical Audit of Perioperative Care
Health & social· Published 30 Jan
CLOSED
28 Feb
£240k
Estimated
Closed
CF
NE
NHS England
Patient safety review of Advanced Practice ePortfolio (supported) Route
R&D services· Published 29 Jan
CLOSED
28 Feb
£180k
Estimated
Closed
CF
UO
UNIVERSITY OF EXETER
Digital Award Certificates Software & Graduation Certificate Paper
IT services· Published 29 Jan
Page 372 of 8764
PreviousNext