PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,251
Live opportunities
Posted · 24h
173
New notices
Posted · 30d
5,881
All notice types
Awarded · 7d
767
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,355 noticesclosed · sorted by publication date
Page 42 of 8568
Time to close
Value
Type
Buyer
Notice
CLOSED
24 Feb
—
Estimated
Modification
FTS
MO
Ministry of Defence
Technical Support Service for Operational Reference & Encyclopaedic Data
· Published 24 Feb
CLOSED
24 Feb
—
Estimated
Modification
FTS
MO
Ministry of Defence
Support to the Maritime Operations Domain
· Published 24 Feb
CLOSED
30 Mar
—
Estimated
Closed
CF
G
GLDM
EXPRESSIONS OF INTEREST CONTRACT FOR THE PROVISION OF GROUNDS MAINTENANCE SERVICES ON BEHALF OF THE PALLADIAN ACADEMY TRUST
Agriculture & forestry· Published 24 Feb
CLOSED
24 Feb
—
Estimated
Modification
FTS
MO
Ministry of Defence
Public Royal Navy Website Development Support Service
· Published 24 Feb
CLOSED
27 Mar
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Advertising Sales Contract
Business services· Published 24 Feb
CLOSED
24 Feb
—
Estimated
Modification
FTS
BD
Braintree District Council
EPP0322 NEEB Business Support (Tender)
· Published 24 Feb
CLOSED
27 Mar
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - South Cambs Magazine Delivery Contract
Postal & telecomms· Published 24 Feb
CLOSED
24 Feb
—
Estimated
Modification
FTS
LC
Leeds City Council
Non Housing Roofing Responsive Repairs
· Published 24 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
TW
Tunbridge Wells Borough Council
Invitation to Tender For Relining of Pond at Kent & Sussex Crematorium
· Published 23 Feb
CLOSED
20 Mar
—
Estimated
Closed
CF
LF
Lycee Francais Charles de Gaulle
REFURBISHMENT OF THE WELLBEING CENTRE OF SOUTH KENSINGTON SITE LFCG
Construction work· Published 23 Feb
CLOSED
03 Mar
—
Estimated
Closed
CF
BB
BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Balfour Beatty - Roads North of the Thames-LTC - Demolition Works
Construction work· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
WC
Wrexham County Borough Council
Framework for the Repair and Maintenance of Public Rights of Way
· Published 23 Feb
CLOSED
13 Mar
—
Estimated
Closed
CF
BT
Broseley Town Council
Conversion of Existing Storage Unit to Public Toilet Facility
Construction work· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
TF
Transport for London
Customer Toilet - Refurbishment
· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
TF
Transport for London
Kings Cross Escalators 4-6 Replacement Project - Enabling Works
· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
TF
Transport for London
Staff Welfare and Customer Toilet Programme Delivery Framework
· Published 23 Feb
CLOSED
23 May
£1.0m
Estimated
Closed
CF
BC
Bristol City Council
Cold Water Mains Responsive Repairs and Maintenance 2025-9
Construction materials· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
TF
Transport for London
Power Enhancement Design and Build
· Published 23 Feb
CLOSED
13 Mar
£100k
Estimated
Closed
CF
KT
Kier Transportation - CP7 NWC
Manchester International Airport - Compound Set Up Electrical
Construction work· Published 23 Feb
CLOSED
23 Feb
—
Estimated
Modification
FTS
NW
NHS Wales Shared Services Partnership (hosted by Velindre University NHS Trust)
PREVENTION AND MANAGEMENT OF VIOLENCE AND AGGRESSION (PMVA)TRAINING
· Published 23 Feb
Page 42 of 8568
PreviousNext