PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
227
New notices
Posted · 30d
8,315
All notice types
Awarded · 7d
1,070
Market signal

Notice peek

×
BB
ClosedCF · 3b5e885bae83

WP15.04 IEP Access and Retaining Wall - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV
Status
Closed
Estimated
£5.0m
Published
10 Apr 2025

Key facts

Notice ID
cf-e7f64e8b-2281-4640-aa83-3b5e885bae83
CPV code
44212400 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Apr 2025

Description

WP 15.04 IEP Access and Retaining wall Scope The scope consists of two key components: A new/altered access route at the west end of the Hitachi IEP Depot to facilitate construction works for the wider project. A new retaining wall structure to retain the IEP Depot infrastructure whilst also forming the eastern boundary of the new Old Oak Common Lane alignment. The following will be required: Detailed design, supply and installation of the above scope. Fully coordinated design with the existing and new Old Oak Common Lane alignments, Part 2/3 bridge structure, utilities through Old Oak Common Lane and the GWML UTX tunnels. Provide RIBA 5 design and construction drawings including setting out detailing, general arrangements, and elevation drawings for construction. Provide samples and construct a mock up in accordance with the Old Oak Common Lane Schedule 17 architectural requirements IEP Depot Access Route (Stage 2) - the ramp The existing access route in the southwest corner of the Hitachi IEP Depot needs adapting to suit Old Oak Common (BBVS and SRSA) construction traffic requirements. IEP Depot Retaining Wall Construction of a new bored piled retaining wall supporting the embankment to the south west corner of the IEP Depot. Piling, plunge columns, concrete planks, masonry finish, backfilling, RC concrete Could separate our piling/plunge columns from other works Piling could be incorporated into the highways scope Utility diversions to enable works above Several existing utilities running through the IEP Depot will need to be diverted or managed before major civils and excavation works can commence. These include: Foul sewer Multiple LV electricity supplies Telecoms

You might also see

  • All Balfour Beatty VINCI Systra JV notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 69 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
26 Jan
—
Estimated
Closed
CF
N
NS&I
Financial Market Intelligence Reports & Monitoring
Business services· Published 19 Jan
CLOSED
19 Jan
—
Estimated
Closed
FTS · Works
UO
University Of Edinburgh
Asbestos Works and Services
Construction work· Published 19 Jan
CLOSED
20 Jan
—
Estimated
Closed
CF
MA
MAIDSTONE AND TUNBRIDGE WELLS NHS TRUST
Service for ward dishwashers
Industrial machinery· Published 19 Jan
CLOSED
01 Feb
—
Estimated
Closed
CF
PD
PEOPLES DISPENSARY FOR SICK ANIMALS
Provision of Veterinary Wholesaler Services to PDSA
Health & social· Published 19 Jan
CLOSED
19 Jan
—
Estimated
Modification
FTS
SC
Stoke-on-Trent Council
Wellfield Interior Designer
· Published 19 Jan
CLOSED
13 Feb
—
Estimated
Closed
CF
TN
THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
National Trust - Nature Towns & Cities Communities Programme Co-design
Business services· Published 16 Jan
CLOSED
16 Jan
—
Estimated
Modification
FTS
MO
Ministry of Defence, DIO,
CMF Alumni Network Platform
· Published 16 Jan
CLOSED
16 Jan
—
Estimated
Closed
FTS · Services
IO
Independent Office of Police Conduct
General Legal Services to the IOPC Peoples team
· Published 16 Jan
CLOSED
20 Feb
—
Estimated
Closed
CF
CH
COOPER & HALL LTD
Redvelopment of Turnbridge Mills, Huddersfield
Construction work· Published 16 Jan
CLOSED
16 Jan
—
Estimated
Closed
FTS · Works
DC
Durham County Council
South Church Enterprise Park - Bishop Auckland
· Published 16 Jan
CLOSED
13 Feb
£60k
Estimated
Closed
CF
LB
London Borough of Bromley
18 Layhams Road - New Kitchen & Remedial Damp Proofing Works
Architecture & engineering· Published 16 Jan
CLOSED
20 Feb
—
Estimated
Closed
CF
LB
London Borough of Merton
School Meals Catering Service
Hotel & restaurant· Published 16 Jan
CLOSED
28 Jan
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Server, IP video system and electronic equipment
Electrical machinery· Published 16 Jan
CLOSED
16 Jan
—
Estimated
Modification
FTS
BD
Bolsover District Council
The Provision of the Supply and Delivery of Janitorial Products
· Published 16 Jan
CLOSED
16 Jan
£25k
Estimated
Closed
CF
BC
Blackpool Council
25 belmont Road
Construction work· Published 16 Jan
CLOSED
16 Jan
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Heating System Replacement - FY2026/27 - Amey Central or North Regions
Construction work· Published 16 Jan
CLOSED
16 Jan
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Kitchen Replacement - FY2026/27 - Amey Central or North Regions
Construction work· Published 16 Jan
CLOSED
16 Jan
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Electrical Rewiring - FY2026/27 - Amey Central or North Regions
Construction work· Published 16 Jan
CLOSED
16 Jan
£4.5m
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Bathroom Replacement - FY2026/27 - Amey Central or North Regions
Construction work· Published 16 Jan
CLOSED
16 Jan
—
Estimated
Modification
FTS
TC
THE CAMBRIDGE HOUSING SOCIETY LTD
Housing with Care Data System
· Published 16 Jan
Page 69 of 8261
PreviousNext