PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
226
New notices
Posted · 30d
9,317
All notice types
Awarded · 7d
1,153
Market signal

Notice peek

×
JM
ClosedCF · a3ae12f288a4

Marston BBM Scheme

J Murphy & Sons Limited
Status
Closed
Estimated
£20.0m
Published
13 Aug 2025

Key facts

Notice ID
cf-9433b5da-6233-438f-8765-a3ae12f288a4
CPV code
45000000 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    13 Aug 2025

Description

"The main contracted works is for the construction of a new overbridge (Marston Road Overbridge) to facilitate the decommissioning of the current Marston Road Level Crossing. The Level Crossing is situated on the Bletchley and Bedford Midland Line (BBM) @ 9m 02ch. The scope of the works is the construction of the new bridge and assosciated works as per the current Form 2 Design. Works involve but not limited to the following: The works to be carried out include but not limited to the list below: 1. Consultation with stakeholders to agree the level of welfare provision, access arrangements, service diversions and other works necessary to enable commencement of the works. 2. Undertaking of enabling works to create a worksite suitable for the works. 3. Temporary Works development to enable permanent works construction. 4. Installation of the new drainage ditch either side of the new highway. Pipework, chambers, under track crossing, and headwall structures for the underground culvert diversion on the East side of the existing road alignment. 5. Construction of the piled foundation & pile caps either side of the railway lines to support the installation of the new abutment, wingwalls and restraint barriers. 6. Construction of the bridge abutments, cills and wingwalls. 7. Procurement and fabrication of beams, approach units, bearings, parapet, waterproofing and surfacing of the of the new bridge structure. 8. Installation of approach embankments to the abutments with engineered material combined with the installation of deck drainage and highway drainage to outfall. 9. Construction of the embankment slopes and ancillary highway infrastructure including carriageway, white lining, verges, tie-ins, footpaths, approach safety barriers, fencing and service ducting from Chainage 10m to Chainage 540m as per Form F (180940-MUR-ZZ-XX-DRG-EHW-000). 10. Diversion and reinstallation of the Statutory Services (Anglian Water, Cadent Gas, UK Power Network, Openreach (BT)) in the new highway overbridge infrastructure. 11. Installation of cable troughs, and chambers on under track crossings for systems cabling. 12. Telecommunications related modification works. 13. E & P related modification & installation works. 14. Signalling related modification works. 15. De-vegetation and landscaping works as per the ecological and landscape design documentation. The stating date for the Main Contract Works was [insert] and the completion date for the whole of the Main Contract Works is [insert] "

You might also see

  • All J Murphy & Sons Limited notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 92 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
15 Dec
—
Estimated
Closed
CF
PI
PALLADIUM INTERNATIONAL LIMITED
Modular accommodation delivery and assembly in Ghana
Construction materials· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
ES
East Suffolk and North Essex NHS Foundation Trust
ESNEFT2711 Intellectual Property Advice
· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
SM
Solihull Metropolitan Borough Council
SOL - Your Future Chelmsley Wood & Building Retrofit Pilot 2025
· Published 27 Nov
CLOSED
13 Jan
£20k
Estimated
Closed
CF
AA
Aiskew and Leeming Bar Parish Council
Grass Cutting - Aiskew and Leeming Bar
Agriculture & forestry· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
SD
South Derbyshire District Council
SDDC Dog Kennelling Services
· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Closed
FTS · Services
GC
Glasgow City Council
CivTech 10.5 - How might we use technology to better understand the supply and demand of digital economy skills at the regional level - both today and in the future.
Software packages· Published 27 Nov
CLOSED
17 Dec
—
Estimated
Closed
CF
CM
CRAGG MANAGEMENT SERVICES LIMITED
Manchester Cathedral - Our Cathedral Our City - Project Quantity Surveyor
Architecture & engineering· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
M
MHRA
Car Park and Road Resurfacing
· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
TS
TODDINGTON ST GEORGE CHURCH OF ENGLAND ACADEMY
Technical Adviser for CIF2026-27
· Published 27 Nov
CLOSED
18 Dec
£500k
Estimated
Closed
CF
TU
Teesside University
GB-Middlesbrough: Olympia VRF Replacement
Construction work· Published 27 Nov
CLOSED
08 Dec
—
Estimated
Closed
CF
UO
University of Bristol
Containerised Research Lab - Market Testing
Mining machinery· Published 27 Nov
CLOSED
27 Nov
—
Estimated
Modification
FTS
SH
Salix Homes Limited
Passenger, Domestic Lifts and Hoists Service, Repair/Maintenance and Installation
· Published 27 Nov
CLOSED
19 Dec
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Community Facilities, Allotments and Burial Places Study
Architecture & engineering· Published 27 Nov
CLOSED
30 Jan
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Refurbishment and Renovation of Two Office Locations into One and Two Bedroom Flats, situated at Chaston Road, Great Shelford & Elms Court, Over
Construction work· Published 27 Nov
CLOSED
23 Dec
—
Estimated
Closed
CF
VD
VIVO DEFENCE SERVICES LIMITED
Rudloe Roofing
Construction work· Published 27 Nov
CLOSED
09 Dec
£50k
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
A66 Northern Trans-Pennine (NTP) - Warcop MoD Asbestos Survey
Sewage & refuse· Published 27 Nov
CLOSED
26 Nov
—
Estimated
Modification
FTS
FC
Foreign Commonwealth and Development Office
CPG121272025 Provision of WHRA & Water Bacteriological Testing for the British Residences in Washington DC
· Published 26 Nov
CLOSED
15 Dec
—
Estimated
Closed
CF
AP
ALIGN PROPERTY SERVICES LIMITED
PBIF Small Works 2025 - Conservation & Repairs to Historic Buildings at the National Coal Mining Museum
Construction work· Published 26 Nov
CLOSED
12 Dec
—
Estimated
Closed
CF
CO
City of Wolverhampton College
CA16801 - City of Wolverhampton College Telford B2 Unit Refurbishment
Construction work· Published 26 Nov
CLOSED
26 Nov
—
Estimated
Modification
FTS
BC
BRITISH COUNCIL(THE)
ITT - YU93TVET52025 - IT Equipment for COE in Pakistan
· Published 26 Nov
Page 92 of 8261
PreviousNext